Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Jinchen draws up Malaysian unit – PV Magazine International

June 7, 2025

Saatvik Solar starts working on 4.8 GW cell, 4 GW module factory in India

June 7, 2025

New Mexico opens $ 5.3 million commercial Energy Efficiency Program

June 7, 2025
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Saturday, June 7
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Policy - Longi gets the green light for 1.05 GW of wind and solar energy – SPE
Policy

Longi gets the green light for 1.05 GW of wind and solar energy – SPE

solarenergyBy solarenergyAugust 21, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Longi Green Energy says it has received regulatory approval for a 1.05 GW wind-solar hydrogen project in Inner Mongolia, while Jolywood Technology says it has postponed its 7.2 GW residential solar project due to unfavorable market conditions .

August 20, 2024 Vincent Shaw

Longi green energy has received regulatory approval for a wind-solar-hydrogen project in Wulate Rear Banner, Inner Mongolia. Its subsidiary Wulate Rear Banner Longfuqi New Energy Technology will invest approximately CNY 6.974 billion ($975.7 million) to develop 1.05 GW of renewable energy capacity, including 850 MW of wind power, 200 MW of solar power and 157.5 MW/ 315 MWh of energy storage. The project aims to produce 54,000 tons of green hydrogen per year for Bayan Nur Longjiahui Biomass Processing, which will use it for the production of green methanol. Construction is expected to begin in 2025 and work will begin in 2026.

pv magazine

The summer edition of pv magazine takes to the beaches to pursue the solar energy advances being developed on island nations around the world. Ranging from Mauritius to Réunion and from the Caribbean to the Orkneys, we look at solar energy on small islands and consider new mining techniques to meet the rising global demand for lithium as a battery material.

Jolywood technology said it has postponed its residential solar distributed development agreement with Shanghai Yuan Ye New Energy due to unfavorable PV market conditions. The original plan was to develop an engineering, procurement and construction (EPC) project with an initial capacity of 1.2 GW and a minimum annual increase of 1.5 GW from the second to the fifth year, with the aim of more than 7.2 GW of total installed capacity within five years. years. However, according to the company, this plan is now on hold.

See also  Solar Backup Solutions for Colorado Homes

Aiko Solar has signed a strategic cooperation agreement with Shantie Green Energy Technology (Shanghai) in Yiwu, Zhejiang Province. They aim to develop a 1 GW renewable energy project in Shandong province within the next one to two years, using Aiko’s n-type ABC series modules.

This content is copyrighted and may not be reused. If you would like to collaborate with us and reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Source link

Energy Green light Longi solar SPE wind
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Jinchen draws up Malaysian unit – PV Magazine International

June 7, 2025

Saatvik Solar starts working on 4.8 GW cell, 4 GW module factory in India

June 7, 2025

New Mexico opens $ 5.3 million commercial Energy Efficiency Program

June 7, 2025
Leave A Reply Cancel Reply

Don't Miss
Policy

Scientists assess heat dissipation factors in fixed, single-axis PV modules – SPE

By solarenergyOctober 26, 20240

Scientists spent months measuring two fixed panels and two single-axis modules to determine their site-specific…

PV Hardware offers 5 GW of household solar -trackers for Safe Harbor -Fitness

May 31, 2025

Power Roll develops 12.8%-efficient back-contact perovskite-zonne devices

March 3, 2025

Midsummer, Kaisheng partner in thin-film solar energy production

May 2, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Jinchen draws up Malaysian unit – PV Magazine International

June 7, 2025

Saatvik Solar starts working on 4.8 GW cell, 4 GW module factory in India

June 7, 2025

New Mexico opens $ 5.3 million commercial Energy Efficiency Program

June 7, 2025

Solar -Wafer prices have fallen 22.78% since April peak

June 7, 2025
Our Picks

Jinchen draws up Malaysian unit – PV Magazine International

June 7, 2025

Saatvik Solar starts working on 4.8 GW cell, 4 GW module factory in India

June 7, 2025

New Mexico opens $ 5.3 million commercial Energy Efficiency Program

June 7, 2025
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2025 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.