Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Jinchen draws up Malaysian unit – PV Magazine International

June 7, 2025

Saatvik Solar starts working on 4.8 GW cell, 4 GW module factory in India

June 7, 2025

New Mexico opens $ 5.3 million commercial Energy Efficiency Program

June 7, 2025
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Saturday, June 7
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Commercial & Industrial - Rushcliffe Borough Council secures £1.2 million for solar PV
Commercial & Industrial

Rushcliffe Borough Council secures £1.2 million for solar PV

solarenergyBy solarenergyAugust 23, 2024No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email
The Leisrue center will also install air source heat pumps to become more energy efficient. Image: Rushcliffe Borough Council.

Rushcliffe Borough Council (RBC) has been awarded £1.2 million to reduce CO2 emissions from the Cotgrave Leisure Centre, with plans to utilize solar PV modules and air source heat pumps.

The funding was allocated under the Department for Energy Security and Net Zero’s Public Sector Decarbonization Scheme. RBC also secured £250,000 from the Department for Culture, Media and Sport through the Swimming Pool Support Fund, managed by Sport England.

As part of the initiative, solar panels will be installed on the roof of the leisure center. These modules are expected to generate up to 55,000 kWh of electricity annually, translating into a saving of up to £25,000 on running costs.

The installation of solar PV modules is part of RBC’s wider strategy to modernize the Cotgrave Leisure Centre, with a focus on sustainability and energy efficiency. As such, the center will also install low-carbon air source heat pumps.

These units, powered by renewable energy, will increase the energy efficiency of heating the pool and surrounding areas with an expected efficiency of 250% to 300%.

Rushcliffe Borough Council’s portfolio holder for leisure and wellbeing, ICT and member development, Councilor Jonathan Wheeler, believes the development and integration of solar energy will help the council achieve its environmental goals and become carbon neutral by 2030.

“The additional funding we have secured for decarbonisation and solar energy means we can make great progress towards our environmental goals of operating as a carbon neutral municipality by 2030,” Wheeler said.

“In total, we are investing £5.2 million in these renovations and energy efficient upgrades over the next two years, which will improve the quality of the facilities for residents and visitors and increase their sustainability.”

See also  How a British solar developer acted on Community Feedback

Work on the solar PV installation and heat pumps will start in the spring of 2025.

Recreation centers are turning to solar PV

In April 2024, Worcester City Council received £195,000 from the UK Government’s Swimming Pool Support Fund, as did RBC, to add solar panels to the roof of the Perdiswell Leisure Centre.

The PV modules will be installed by March 2025 alongside a unit that will use the excess energy produced during the summer months to heat water for the showers, fans that will recirculate warm air to reduce heating demand, and a energy efficient water recovery system that creates and reuses clean water.

In addition, West Lindsey District Council had been allocated £401,500 to install 545 solar PV modules at the leisure centre, saving 221 MWh of annual energy production. This was allocated under the Swimming Pool Support Fund in the second phase.

Source link

Borough Council million Rushcliffe secures solar
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Saatvik Solar starts working on 4.8 GW cell, 4 GW module factory in India

June 7, 2025

New Mexico opens $ 5.3 million commercial Energy Efficiency Program

June 7, 2025

Solar -Wafer prices have fallen 22.78% since April peak

June 7, 2025
Leave A Reply Cancel Reply

Don't Miss
Technology

Low-cost machine learning framework for snail trail detection in PV panels – SPE

By solarenergySeptember 4, 20240

The new system, devised by French scientists, uses ensemble learning and requires nothing more than…

New research suggests an optimal tilt corner, overhead height for PV systems on the roof

February 12, 2025

Q3 Energy Presents String Combiner Box with error detection – PV Magazine International

May 22, 2025

Researchers use artificial neural networks to optimize PV tilt angles – SPE

August 21, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Jinchen draws up Malaysian unit – PV Magazine International

June 7, 2025

Saatvik Solar starts working on 4.8 GW cell, 4 GW module factory in India

June 7, 2025

New Mexico opens $ 5.3 million commercial Energy Efficiency Program

June 7, 2025

Solar -Wafer prices have fallen 22.78% since April peak

June 7, 2025
Our Picks

Jinchen draws up Malaysian unit – PV Magazine International

June 7, 2025

Saatvik Solar starts working on 4.8 GW cell, 4 GW module factory in India

June 7, 2025

New Mexico opens $ 5.3 million commercial Energy Efficiency Program

June 7, 2025
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2025 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.