Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Sunday, June 7
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Solar Panels - Meyer Burger withdraws plans to produce silicon cells in the US
Solar Panels

Meyer Burger withdraws plans to produce silicon cells in the US

solarenergyBy solarenergyAugust 26, 2024No Comments1 Min Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Meyer Burger announced today that it is suspending the planned construction of a silicon solar cell manufacturing facility in Colorado Springs, Colorado, because it is “no longer financially viable for the company.”

The Swiss technology company first announced plans for a cell factory in July 2023. The 2 GW operations at a former Intel semiconductor plant would support its solar panel assembly plant in Goodyear, Arizona, which officially began production in June. Instead, Meyer Burger said its existing cell manufacturing facility in Thalheim, Germany, will remain fully operational and will remain the company’s primary supplier of solar cells.

“Under current market conditions, these are [German] solar cells are the most economical option for supplying module production in Goodyear,” the company said in a press release.

Meyer Burger specializes in heterojunction technology (HJT), a combination of crystalline silicon and thin film of amorphous silicon. The company to block its German solar panel manufacturing facility earlier this year following the collapse of the European panel manufacturing market.

Meyer Burger also announced today that it will not scale its solar panel assembly plant in Arizona beyond 1.4 GW, but noted that the building could support 2 GW or more.

Source link

See also  Recycling plans have already been established for new Canadian solar panels with the SolarCycle deal
Burger cells Meyer plans produce silicon withdraws
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Research shows POLO back-junction solar cells could outperform PERC in terms of cost in Europe – SPE

May 26, 2026

JA Solar and Gold Stone Energy claim world’s highest efficiency for silicon solar cells with 28.2% efficient back contact device

May 25, 2026

Slovakia plans to develop energy communities – SPE

May 25, 2026
Leave A Reply Cancel Reply

Don't Miss
Policy

Spain launches a call for access to 3.68 GW of grid capacity – PV Magazine International

By solarenergyJuly 20, 20250

The Spanish government kicked off its first schedule access to 3,681 MW at eight transmission…

Pivot Energy Building 5-MW Agrivoltaic project for University of Colorado Boulder

August 18, 2025

The Ministry of Finance announces the 2024 application opening date for the low-income bonus credit program

May 14, 2024

Hybrid Solar Vanadium Battery System is resistant to the hard weather of Australia – PV Magazine International

February 19, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026

‘Come out from behind your screen, our industry is ultimately about people’

June 6, 2026
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.