Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Solar -Wafer prices have fallen 22.78% since April peak

June 7, 2025

China’s XYZ launches 261 kWh immersion-cooled commercial battery-PV Magazine International

June 7, 2025

Don’t let the Congress undo the energy progress of West Virginia

June 7, 2025
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Saturday, June 7
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - News - Ameresco is celebrating the completion of Utah’s first floating solar project
News

Ameresco is celebrating the completion of Utah’s first floating solar project

solarenergyBy solarenergyOctober 3, 2024No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Photo by Stetson Tchividjian, D3Energy, on LinkedIn

Ameresco celebrated the completion of Utah’s first floating solar array in late September, developed in partnership with Mountain Regional Water Special Service District. The floating solar project, located on a pond at the Signal Hill Water Treatment Plant, was commemorated with a ribbon-cutting ceremony attended by representatives from Ameresco, Mountain Regional Water and Rocky Mountain Power.

Ameresco partnered with D3Energy to develop the 587.5 kW floating solar panels, supported by a $400,000 grant from Rocky Mountain Power’s Blue Sky Award program. By supplying electricity directly to the water treatment plant, the system will offset 92% of the energy consumption of the plant’s electricity grid and reduce energy costs by 80%.

“These floating solar panels demonstrate the benefit of thinking beyond conventional approaches,” said Lou Maltezos, executive VP of Ameresco. “The idea that solar panels must be placed on land is an unnecessary restriction. By rethinking their placement, we unlock new possibilities for sustainability. The district isn’t just implementing solar for itself; they invest deeply in the economics of this project. This first-ever floating solar panel in Utah is both innovative and economically feasible, making it a great example of sustainable development.”

The floating solar panels efficiently use available water surfaces to generate renewable energy, providing an ideal solution for maximizing energy production without impacting land resources.

“Traditional ground or rooftop solar was not an option for us at this facility, but this innovative floating solar installation taps into an untapped resource,” said Chris Braun, Chief Technology Officer of Mountain Regional. “This is one more piece of the puzzle for us to achieve a ‘Net-Zero’ energy goal as we strive to be responsible stewards of the community and the environment.”

See also  US government publishes bottom-up pricing tool for solar energy – SPE

The project was completed ahead of schedule, with construction completed on September 10, 2024 and commissioning completed on September 20. The full operating license for the utility is expected on October 23, 2024.

Rocky Mountain Power’s Blue Sky Program awarded this project to the Mountain Regional Water Service District as one of dozens of community-based renewable energy projects awarded in 2023. Blue Sky is an opt-in program that gives Rocky Mountain Power customers the option to power all or a portion of their energy use with renewable energy, reducing their carbon footprint and driving demand for new renewable energy in the West. Since 2006, Blue Sky program participants have helped finance more than 216 new community-based renewable energy projects in the communities of Utah, Idaho and Wyoming.

News item from Ameresco

Source link

Ameresco celebrating completion floating project solar Utahs
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Solar -Wafer prices have fallen 22.78% since April peak

June 7, 2025

Brazil Solar Import slow as new Chinese trade routes open

June 6, 2025

InensEnergy completes 250 MW Ohio Solar Project for Microsoft

June 6, 2025
Leave A Reply Cancel Reply

Don't Miss
News

Kitu Systems is rolling out new EV Charge Management Platform

By solarenergyApril 26, 20250

Kitu Systems has announced the launch of his new EV Charge Management Software, Expedition CMS.…

Panama launches energy auction – SPE

October 14, 2024

Trina donates solar panels to a Wisconsin nonprofit working to create a low-carbon economy

January 23, 2025

Catalyze, GreenSpark Solar Announces Expansion of the New York Community Solar Partnership

July 24, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Solar -Wafer prices have fallen 22.78% since April peak

June 7, 2025

China’s XYZ launches 261 kWh immersion-cooled commercial battery-PV Magazine International

June 7, 2025

Don’t let the Congress undo the energy progress of West Virginia

June 7, 2025

Brazil Solar Import slow as new Chinese trade routes open

June 6, 2025
Our Picks

Solar -Wafer prices have fallen 22.78% since April peak

June 7, 2025

China’s XYZ launches 261 kWh immersion-cooled commercial battery-PV Magazine International

June 7, 2025

Don’t let the Congress undo the energy progress of West Virginia

June 7, 2025
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2025 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.