Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Monday, June 8
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Energy Storage - Australian developer opts for longer battery life to boost project economics – SPE
Energy Storage

Australian developer opts for longer battery life to boost project economics – SPE

solarenergyBy solarenergyJune 13, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Renewable energy developer Frontier Energy has extended the storage life of its 80 MW Waroona Renewable battery by 12% to 4.5 hours

June 13, 2024 Ev Foley

From pv magazine ESS news place

Western Australian (WA) renewable energy company Border Energy has made its final technology choice for the Waroona Renewable Energy Project Stage One, increasing the capacity of its 80MW battery component by 12% to 4.5 hours, compared to the originally planned four hours of storage.

The project near Parth includes a 120 MW solar park. The developer expects that the increased on-site battery capacity will allow for additional storage of electricity during times of low prices, and transmission during times of peak prices, which will benefit the economics of the project.

Frontier Energy CEO Adam Kiley said the company is in the fortunate position that the costs of its two largest capital assets, solar panels and lithium iron phosphate (LFP) batterieshave fallen significantly since the release of the project’s first definitive feasibility study (DFS) in February, which estimated costs at $118.5 million.

“Battery prices have fallen due to a combination of factors, including falling commodity prices, improving supply chains and reportedly weaker than expected demand, resulting in an ample supply of batteries in the current market,” he said.

“This unique situation is to Frontier’s advantage, with improved battery capacity resulting in longer life, approximately 4.5 hours compared to 4 hours in the DFS, increasing Waroona’s revenue while achieving lower capital costs.”

To read further, visit our new ESS news website.

This content is copyrighted and may not be reused. If you would like to collaborate with us and reuse some of our content, please contact: editors@pv-magazine.com.

See also  1.4 GW of BESS capacity could be co-located with the AR6 winners

Source link

Australian battery boost developer economics life longer opts project SPE
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

UK government considers community grant for battery storage

June 5, 2026

UK CfD scheme provides optimism for the UK investment landscape

June 5, 2026

Nova commissions a 400kW floating solar project in Cheshire

June 4, 2026
Leave A Reply Cancel Reply

Don't Miss
Policy

IFC -Loingen $ 250 million for Oman Polysilicon Project – PV Magazine International

By solarenergyAugust 11, 20250

The investment package has a $ 200 million loan for the implementation of the project…

Agrivoltaic energy for peppers

December 4, 2024

ECA will sell solar energy projects in Delaware to Luminace

May 4, 2024

Land use framework to protect agricultural land of high quality

February 3, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026

‘Come out from behind your screen, our industry is ultimately about people’

June 6, 2026
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.