Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Sol Systems adds to project portfolio with Texas acquisition | Projects Weekly

August 31, 2026

Climate-Linked Supply Chain Risk Is Already In Your P&L

August 26, 2026

Drake Plastics gets new carport project near Houston | Projects Weekly

August 17, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Sunday, September 6
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Commercial & Industrial - Canadian Solar ends the first quarter with three British developments
Commercial & Industrial

Canadian Solar ends the first quarter with three British developments

solarenergyBy solarenergyApril 1, 2026No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Canadian Solar ended March by announcing two projects and a sale, as the renewable energy supplier expands its UK footprint.

Expansion to England and Scotland

Canadian solar energy‘s energy storage solutions subsidiary, e-STORAGE, will supply 420MWh AC of battery energy storage systems (BESS) in two projects for Drax Group. The projects will be part of the sustainable energy company’s FlexGen portfolio.

The two installations include a 60 MW / 120 MWh AC installation in Marfleet, England, and a 150 MW / 300 MWh AC installation in Neilston, Scotland. Installations are expected to begin in the third quarter of 2026 and early 2027, respectively.

Drax Group Chief Operations Officer Lee Dawes said: “This is our first investment in short-term storage, and these assets will complement our existing generation portfolio.”

“As the UK grid becomes increasingly reliant on intermittent renewable energy sources, these batteries will provide safe power and help keep the lights on when the wind doesn’t blow and the sun doesn’t shine.”

Related:Matrix Renewables uses EDF to optimize 1GWh Scotland BESS

A fully integrated and deployed BESS will be provided by e-STORAGE – including the SolBank 3.0 batteries – and it will also oversee operations under a long-term service agreement (LTSA). This includes monitoring, performance analysis and preventive maintenance.

According to Canadian Solar’s announcement, the goal of the agreement with e-STORAGE is to provide “consistent operational availability” throughout the entire life cycle of the projects. The company explained that this will improve network flexibility in their respective regions and contribute to the adoption of renewable energy sources in Britain.

See also  Australia gives the green light for the world's largest solar hub

Apatura, a UK-based energy infrastructure company, is developing both projects as the company specializes in digital infrastructure and large-scale BESS. Giles Hanglin, CEO of Apatura, added: “By combining our development expertise with e-STORAGE’s technology and Drax’s operational capabilities, we are delivering assets that strengthen grid security and allow more renewable energy to flow into the system.”

“This partnership with Drax and Apatura reflects our shared commitment to advancing a more flexible and resilient energy system in the United Kingdom,” said Colin Parkin, president of both Canadian Solar and e-STORAGE.

“Leveraging the strong foundation and operational expertise we have built in this market, we are committed to delivering reliable system performance and excellent service to customers across Europe.”

Recurrent sells solar PV installation in Cornwall

The Marfleet and Neilston projects are not Canadian Solar’s only recent UK developments.

Related:Shares available in the ‘UK-first’ community-owned battery energy storage system

The company also ended March with a promotion for Project Higher Witheven – a 42.5 MWp solar project in Cornwall, England – through its subsidiary Recurrent Energy. Earlier this month, the ready-to-build site was sold to investment manager Downing. At the end of March, Higher Witheven had also secured a Contract for Difference (CfD) in the UK government’s Allocation Round 7 (AR7) auction.

In the company’s official announcement, Ismael Guerrero, CEO of Recurrent Energy, said: “The Higher Witheven transaction underlines our ability to develop, develop and successfully commercialize high-quality renewable energy sources.

“Securing a CfD in AR7 further strengthens the competitiveness of our UK pipeline.”

Recurrent Energy’s announcement stated that the site had been designed with long-term environmental impact and management considerations. As such, the project was developed with biodiversity and landscaping in mind.

See also  London Stadium will install solar panels

Higher Witheven is expected to generate more than 46,000 MWh of renewable energy per year and has an expected completion date of the fourth quarter of 2027.



Source link

British Canadian Developments ends quarter solar
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Report: US data center development slows in first quarter

July 30, 2026

Türkiye will add 2.1 GW of solar energy in the first half of the year

July 30, 2026

Taiwan introduces new solar regulations for large buildings

July 29, 2026
Leave A Reply Cancel Reply

Don't Miss
Utility

DOE is distributing $10 million for improved large-scale renewable energy permitting processes

By solarenergyApril 25, 20240

The U.S. Department of Energy (DOE) today announced $22 million to improve the planning, siting…

What is a feasibility study for solar energy?

May 17, 2024

Battery storage in Spain could become unfeasible beyond 32 GWh – SPE

January 22, 2026

Balance capacity granted planning approval for 49.5 MW Bess

April 17, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Sol Systems adds to project portfolio with Texas acquisition | Projects Weekly

August 31, 2026

Climate-Linked Supply Chain Risk Is Already In Your P&L

August 26, 2026

Drake Plastics gets new carport project near Houston | Projects Weekly

August 17, 2026

What Counts For Scope 3 Targets

August 12, 2026
Our Picks

Sol Systems adds to project portfolio with Texas acquisition | Projects Weekly

August 31, 2026

Climate-Linked Supply Chain Risk Is Already In Your P&L

August 26, 2026

Drake Plastics gets new carport project near Houston | Projects Weekly

August 17, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.