Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Monday, June 8
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Policy - China Resources announces winners of 1.85 GW tender – SPE
Policy

China Resources announces winners of 1.85 GW tender – SPE

solarenergyBy solarenergyJune 12, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

China Resources Power has announced the winners of the second round of tenders for PV modules for 2024, while Sichuan Shuoyang Heterojunction New Energy has unveiled plans to invest in a 10 GW heterojunction solar cell (HJT) project in Sichuan province.

June 12, 2024 Vincent Shaw

Photos: Eckhart K. Gouras, pv magazine

Chinese resource power said GCL System Integration (GCL SI) and Huayao PV won the second wave of PV module purchases for 2024, for a total of 1.85 GW. GCL SI has secured the first two segments, with 1.3 GW of expected orders, while Huayao PV is expected to purchase 550 MW.

Lingda Group said it will end its investment in the Tongling project for the production of high-efficiency PV cells, which would initially have an annual capacity of 20 GW. The project involved an estimated investment of CNY 9.15 billion ($1.26 billion). The company says it now needs to effectively manage external investment risks.

Sichuan Shuoyang Heterojunction New Energy said it plans to invest in a 10 GW HJT cell project in Leshan, Sichuan province. The company said it will build the CNY3.5 billion project in two phases of 5 GW.

This content is copyrighted and may not be reused. If you would like to collaborate with us and reuse some of our content, please contact: editors@pv-magazine.com.

Source link

See also  Data center specialist begins construction of 120 MW of solar energy in South Africa – SPE
announces China Resources SPE tender winners
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
Leave A Reply Cancel Reply

Don't Miss
Technology

Field Survey Protocol For Monitoring PV – Achter breakdown – PV Magazine International

By solarenergyMarch 21, 20250

A research group including scientists from the American National Institute of Standards and Technology (NIST),…

Chinese researchers build 21.60%-efficient perovskite solar modules via Blade Coating-PV Magazine International

July 9, 2025

The Czech Republic changes the threshold of electricity generation – PV Magazine International

September 28, 2025

Martin Roofing & Solar’s non-penetrating roof mount receives UL 2703 certification

May 1, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026

‘Come out from behind your screen, our industry is ultimately about people’

June 6, 2026
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.