Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Monday, June 8
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Solar Industry - Construction begins on a 12 MW Swiss PV project in the Alps
Solar Industry

Construction begins on a 12 MW Swiss PV project in the Alps

solarenergyBy solarenergyJanuary 17, 2025No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Work has started on the Swiss Madrisa Solar project, a 12 MW alpine PV plant located at an altitude of 2,000 m near a ski resort in the village of Klosters. It is part of the Solar Express initiative designed to boost domestic winter energy production.

January 17, 2025
Valerie Thompson

Work has started on the 12 MW Madrisa Solar project in Switzerland, an alpine PV plant at an altitude of 2,000 m near a ski and winter sports resort above the village of Klosters. The south-facing PV plant is expected to produce 17 GWh annually when the final phase of the project is completed, a milestone scheduled for the end of 2027.

The project contractor is Madrisa Solar AG, an equally owned joint venture between the municipality of Klosters and two utility companies, Elektrizitätswerke Zürich (EKZ) and Repower AG.

According to Planeco, the Basel-based company responsible for installing the solar PV system, the factory has 19,000 solar panels and 100 inverters, as well as powerful surge arresters with lightning protection.

The 580 W panels are supplied by the German manufacturer Axitec. “The supplier of the inverters has not yet been decided. They will certainly be large string inverters, between 100 and 125 kVA,” says Christian Carpaij, CEO of Planeco and manager of the engineering division. pv magazine.

The plant, located 2,000 meters above sea level, will cost CHF 70 million ($76.75 million) and produce 17 GWh of electricity annually, EKZ said in a press release. It will be connected to a transformer station at the nearby Madrisa ski station.

See also  CIV Robotics protects $ 7.5 million to modernize the construction of renewable energy

The facility will be built in phases and completed by the end of 2027. “The biggest challenge is the short alpine season for safe installation conditions. It requires accurate planning and efficient cooperation of all professionals and suppliers. In addition, there is the deadline that requires that at least 10% of the power must be connected to the grid by the end of 2025 in order to apply for financing,” said Carpaij, referring to the requirement set in the Swiss Solar Express law. which promotes the deployment of alpine PV to strengthen the distribution network by 2030.

Other project partners include Fanzun AG, which provides architecture, engineering and consulting, Amstein Walthert, construction and engineering, Vetsch Klosters AG, logistics and foundation construction, Jörimann Stahlbau AG, structural steel, and Zendra AG, alpine PV engineering.

This content is copyrighted and may not be reused. If you would like to collaborate with us and reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Source link

Alps begins construction project Swiss
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

ComEd starts a new energy pilot with a solar rebate on the roof of a brewery

June 5, 2026

Nova commissions a 400kW floating solar project in Cheshire

June 4, 2026

Aura Power secures financing for 49.9 MWp Staffordshire PV project

June 4, 2026
Leave A Reply Cancel Reply

Don't Miss
News

Summit Ridge, Trajectory Energy breaks ground on a 6.2 MW community solar project in Illinois

By solarenergyAugust 28, 20240

Summit Ridge Energya commercial solar energy company, and Energy partners trajectoryan Illinois-based community solar developer,…

Standardized testing can accelerate indoor solar power for smart devices

October 21, 2025

LONGi achieves an efficiency of 27.3% on HJT solar cells in a laboratory

May 9, 2024

AWM unveils Pinyon Hanger that attaches directly to the mounting system posts

September 13, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026

‘Come out from behind your screen, our industry is ultimately about people’

June 6, 2026
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.