Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Sunday, June 7
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - News - Enso Energy has given the green light for a 49.9 MW solar park in Hampshire
News

Enso Energy has given the green light for a 49.9 MW solar park in Hampshire

solarenergyBy solarenergyNovember 5, 2024No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email
The development will take place on eight plots in the south of England. Image: Oskar Kadaksoo via Unsplash.

Solar energy developer Enso Energy has received planning permission from two councils for a 49.9 MW solar power plant in the south of England.

The Denmead Solar Farm, located on 87 hectares of land under the jurisdiction of East Hampshire County Council and Winchester City Council, has been approved by both relevant bodies for an operational life of 40 years. Although initial proposals for the project, submitted in 2022, included plans for a battery energy storage system (BESS), this was dropped in the ultimately approved development plan after consultants raised concerns about the fire risk of BESS systems and the potential for groundwater contamination if the system were to fail.

Following the approval of the development, further conditions for the approval of the plan have been set by East Hampshire County Council. These include preparing a management plan for remedial measures in the event of a solar panel failure to prevent groundwater contamination and conducting a post-installation noise assessment within three months of the project coming into service.

According to Enso Energy, the development will deliver a net biodiversity gain of 56%, and will allow sheep grazing to continue under and around the 91,840 solar panels that will be installed on the eight plots in the development.

Although a start date for construction has not yet been announced, Enso Energy states that construction will take seven months. The solar power plant will be connected to the local Lovedean substation.

According to local news reports, councilors’ views were initially mixed on the development proposals, with councilor Nick Drew criticizing the development as an “industrialisation of the countryside” and councilor David Ashcroft stating: “We have to do it, it’s very important.” .

See also  Chinese scientists build copper indium sulfide solar cell with 10.44% efficiency - PV Magazine International

A strong year for Enso Energy

This is not the first planning victory that Enso Energy has achieved this year. In July, Secretary of State Matthew Pennycook granted planning permission for the 23MW Honiley Road Solar Farm after it was “revoked” by the previous Secretary of State. The development also includes a 57 MW BESS.

Enso Energy also enjoyed great success during the most recent Contracts for Difference (CfD) auction round, Allocation Round 6 (AR6). The developer has secured CfDs for four of its solar projects, totaling 164 MW. AR6 set new records for the solar industry, with 93 ground-based solar projects totaling 3.3 GW of capacity upon landing during the auction round. Solar achieved a strike price of £50.07/MWh for AR6, well above the £47/MWh of AR5.

Source link

Energy Enso Green Hampshire light park solar
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

Britain’s next energy dependency is already taking shape

June 5, 2026

Letter from China’s PV Industry: Arctech wins 2.1 GW solar deal

June 5, 2026
Leave A Reply Cancel Reply

Don't Miss
Solar Industry

S-5! unveils new mounting systems for rooftop solar energy

By solarenergyApril 27, 20240

S-5!, a mounting systems supplier, plans to release two new mounting components for rooftop PV…

49.9 MW BESS approved near Kintore despite public objections

August 30, 2024

China commissions the first urban underground vanadium flow battery system – SPE

March 11, 2026

Narada Power debuts 783 AH Cell, 8.3 MWH Solid State Battery – PV Magazine International

April 25, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026

‘Come out from behind your screen, our industry is ultimately about people’

June 6, 2026
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.