Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Why the UK solar industry needs to own its safety story

April 23, 2026

Fraunhofer ISE develops colored film technology for patterned solar panels

April 23, 2026

Thermoacoustic heat pumps are on the verge of commercial breakthrough – SPE

April 23, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Thursday, April 23
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Commercial & Industrial - Greenskies completes 575-kW rooftop array for California office complex
Commercial & Industrial

Greenskies completes 575-kW rooftop array for California office complex

solarenergyBy solarenergyJuly 19, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Greenskies announced the completion of a 575-kW roof mount solar system at Belvedere Place, a prominent Class A office complex in Mill Valley, California, located just north of the Golden Gate Bridge.

With over 1,000 solar panels installed, the system is expected to meet 95% of the 105,000-square-foot buildings’ electricity demand, with tenants benefiting from a 10% electricity rate discount. Current occupants of the two three-story buildings include Merrill Lynch, UBS, WeWork, Redwood Trust and several private wealth management firms.

GTIS Partners, a global real estate investment firm based in New York City, and Graham Street Realty, a San Francisco-based commercial real estate owner-operator, acquired Belvedere Place in August 2019. Both sustainability-in-development champions, the joint property owners were motivated to offer tenants access to green power at a discount and contribute to reducing greenhouse gas emissions in a meaningful way. That goal was achieved through partnerships with SolarKal, a commercial solar advisory and procurement firm, and Greenskies Clean Focus, a national leader in renewable energy solutions.

“We are thrilled to celebrate the completion of this important solar energy project,” said Peter Ciganik, partner and head of capital markets at GTIS Partners. “Sustainability and environmental stewardship are deeply integrated into our business model, and we are proud to have been recently named a Gold Level Green Lease Leader by the U.S. Department of Energy Better Buildings Alliance.”

SolarKal analyzed GTIS Partners’ nationwide portfolio, assessed utility bills, designed preliminary photovoltaic systems and modeled returns, ultimately choosing Belvedere Place as a top property for solar development. SolarKal’s proprietary procurement process identified Greenskies Clean Focus as the preferred provider given the firm’s strong local area expertise.

See also  Qcells completes construction of the Ocotillo Wells solar and storage project in California

“This shining California success story demonstrates that there are creative structures like this hybrid PPA roof lease that are a great alternative to community solar, which is still under policy development in California,” said Neil Sharma, co-founder and chief commercial officer of SolarKal. “All parties involved showed a strong commitment to success.”

Greenskies is the project’s developer, financier, owner and long-term operator under a 25-year PPA. Greenskies will also provide ongoing operation and maintenance to the site.

News item from GTIS Partners

Source link

575kW Array California completes complex Greenskies office rooftop
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

HDM Solar opens new distribution branch in Scotland

April 22, 2026

DESNZ to increase windfall tax on renewable energy to 55% in July 2026

April 21, 2026

Tandem PV launches commercial production of perovskite silicon in California – SPE

April 21, 2026
Leave A Reply Cancel Reply

Don't Miss
News

Beryl receives funding for the solar e-bike charging project

By solarenergyAugust 13, 20240

A 3D rendering of a Beryl solar e-bike charging station. Image: Beryl Cornwall Council and…

Gambia launches tender for 50 MW solar plus storage project – SPE

October 6, 2024

Power Roll develops 12.8%-efficient back-contact perovskite-zonne devices

March 3, 2025

Gamechange Solar introduces the terrain-following tracker that is designed to reduce the land of land

July 3, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Why the UK solar industry needs to own its safety story

April 23, 2026

Fraunhofer ISE develops colored film technology for patterned solar panels

April 23, 2026

Thermoacoustic heat pumps are on the verge of commercial breakthrough – SPE

April 23, 2026

The federal court has halted Trump administration orders that hinder solar and wind energy development

April 23, 2026
Our Picks

Why the UK solar industry needs to own its safety story

April 23, 2026

Fraunhofer ISE develops colored film technology for patterned solar panels

April 23, 2026

Thermoacoustic heat pumps are on the verge of commercial breakthrough – SPE

April 23, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.