Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Sunday, June 7
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Policy - Hurricane Melissa floods the Cuban solar park Río Cauto and cuts off the power supply – SPE
Policy

Hurricane Melissa floods the Cuban solar park Río Cauto and cuts off the power supply – SPE

solarenergyBy solarenergyNovember 13, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

The United Nations Development Program (UNDP) says emergency generators, some powered by solar panels, are being deployed as Cuba struggles to restore electricity after the storm.

November 12, 2025
Luis Ini

By pv magazine LatAm

More than 1 million Cubans were without electricity for two weeks after Hurricane Melissa hit the eastern part of the island, damaging solar installations and flooding the 21.8 MW Río Cauto solar farm.

The UNDP said it is installing generators in the communities of Guamo Viejo, Grito de Yara, Vado del Yeso and Cauto Embarcadero in Granma province.

The Río Cauto facility is part of a national plan to build 55 solar farms by 2025. Energy and Mines Minister Vicente de la O Levy said several solar power plants in eastern Cuba suffered structural and electrical damage. Although the installations largely weathered the cyclone, “some panels were damaged,” he said, adding that “the flood levels” forced operators to isolate systems to prevent short circuits.

The UNDP said most of the generators deployed are fuel-powered, although some use standalone 2 kWp PV systems, including one at the university center in Río Cauto. The system is intended “to cover the basic services of the campus – an institution that performs various support functions in emergency situations – and to provide energy access to the surrounding community.”

A similar hybrid system, combined with a fuel-powered generator, was also donated to the University of Granma in Bayamo, the agency said.

This content is copyrighted and may not be reused. If you would like to collaborate with us and reuse some of our content, please contact: editors@pv-magazine.com.

See also  CEO of Northvolt resigns after filing for bankruptcy – SPE

Popular content

Source link

Cauto Cuban cuts floods Hurricane Melissa park power Rio solar SPE supply
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
Leave A Reply Cancel Reply

Don't Miss
Energy Storage

Romania opens €150 million pot for co-located battery storage – SPE

By solarenergyNovember 20, 20240

The Romanian Ministry of Energy has launched a subsidy program for battery energy storage systems…

Belgium allows plug-in solar panels and batteries – SPE

September 12, 2024

800 inhabitants with a low income in California now have access to Sunrun solar energy

April 28, 2025

EDF, PS Renewables to open consultation about proposed Zonne -NSIP

September 12, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026

‘Come out from behind your screen, our industry is ultimately about people’

June 6, 2026
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.