Zonne -Tracker manufacturer Idematec has expanded its strategic partnership with the Parliament Energy Holdings (PEH), the company responsible for the 640 MW, extendedDC Parliament Solar Project In Waller County, Texas. Parliament Solar has not suffered any damage from both Hurricane Beryl and 10 on-site hail events during the construction phase and is now going to operations.

Parliament Solar, a 640 MWDC Site north of Houston, TX comprises more than 3000 hectares with more than 6,000 idematec L: TEC 1P trackers.
Ideematec supplies its horizon L: TEC 1P trackers for PEH’s coming 2.1 GW Project Pipeline in Texas. The first project in this pipeline-a 650 MWDC Installation located south of Dallas – is planned for construction at the end of 2025.
“Our strong track record in hurricane-sensitive regions, combined with our Hagel-Stow design process, gives PEH the confidence that the L: TEC 1P design can withstand both high wind and hail events-even when they occur at the same time,” said Philipp Klemm, CEO of Ideematec.
News item from idematec