Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

Cornwall Insight cuts price ceiling forecast after Burnham’s VAT cut

July 22, 2026

SmartestEnergy, Greentech ink CfD PPA for the Kent solar project

July 22, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Thursday, July 23
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Policy - India completes tender for 1.2 GW solar energy storage at an average price of $0.041/kWh – SPE
Policy

India completes tender for 1.2 GW solar energy storage at an average price of $0.041/kWh – SPE

solarenergyBy solarenergyJuly 17, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Solar Energy Corp. of India (SECI) has closed a 1.2 GW solar and storage tender at an average price of $0.041/kWh, with Acme Solar Holdings, Hero Solar Energy, JSW Neo Energy and Pace Digitek Infra emerging as winners come.

July 17, 2024 Uma Gupta

Image: Avi Waxman, Unsplash

By pv magazine India

SECI has completed its latest tender for 1.2 GW solar power with 600 MW/1.2 GWh storage capacity at a final average price of INR 3.42/kWh.

JSW Neo Energy secured the largest amount of capacity, namely 500 MW. Acme Solar Holdings secured 350 MW and Hero Solar Energy 250 MW. Pace Digitek Infra won 100 MW.

SECI launched a tender in March 2024 to set up 1.2 GW of PV projects with 600 MW/1,200 MWh of energy storage systems (ESS) on a build-own-operate basis. The projects can be implemented anywhere in India and must be connected to the inter-state transmission grid.

SECI will sign a 25-year power purchase agreement (PPA) with the successful bidders to purchase solar power. It will then sell the acquired power to various purchasing entities across India.

The solar developer will install at least 0.5 MW/1 MWh of ESS capacity for each 1 MW contracted project under the PPA. The developer can own the ESS component or collaborate with a third party. The ESS can be co-located with the PV power generation or placed separately within one project.

This content is copyrighted and may not be reused. If you would like to collaborate with us and reuse some of our content, please contact: editors@pv-magazine.com.

See also  Hydrostor signs an offtake agreement in California for 4 GWh compressed air storage – SPE

Popular content

Source link

0.041kWh average completes Energy India price solar SPE storage tender
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

Cornwall Insight cuts price ceiling forecast after Burnham’s VAT cut

July 22, 2026

SmartestEnergy, Greentech ink CfD PPA for the Kent solar project

July 22, 2026
Leave A Reply Cancel Reply

Don't Miss
Solar Industry

Flexible perovskite solar cell based on polycarbonate substrates achieves an efficiency of 13.0%

By solarenergySeptember 26, 20240

An international research group demonstrated the first perovskite solar cells on polycarbonate substrates, suitable for…

NTR supplies eight new locations with energy with a combined generation of 268.5 MW

June 18, 2024

Irish and British schedules connected via 500 MW Substitute HVDC cable – PV Magazine International

April 18, 2025

Off-grid lessons help stimulate new battery technology-PV Magazine International

March 4, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

Cornwall Insight cuts price ceiling forecast after Burnham’s VAT cut

July 22, 2026

SmartestEnergy, Greentech ink CfD PPA for the Kent solar project

July 22, 2026

Flexibility as an asset

July 22, 2026
Our Picks

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

Cornwall Insight cuts price ceiling forecast after Burnham’s VAT cut

July 22, 2026

SmartestEnergy, Greentech ink CfD PPA for the Kent solar project

July 22, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.