Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Origis is developing a 413 MW solar portfolio in West Texas

March 6, 2026

New Jersey expands state community solar program by 3 GW

March 6, 2026

How to address imbalance datasets in solar panel dust detection

March 5, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Friday, March 6
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Policy - India expects to install approximately 42.5 GW of new solar capacity by 2026 – SPE
Policy

India expects to install approximately 42.5 GW of new solar capacity by 2026 – SPE

solarenergyBy solarenergyFebruary 28, 2026No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

According to JKM Research, India installed approximately 37.8 GW of solar capacity by 2025. This included approximately 28.6 GW of new utility-scale solar, up 54.6% from 2024, and 7.9 GW of rooftop solar, up 72% year-over-year. The off-grid additions amounted to 1.35 GW, compared to 1.48 GW in 2024.

February 27, 2026
Uma Gupta

By pv magazine India

JMK Research expects India to add approximately 42.5 GW of new solar capacity in calendar year (CY) 2026. This is expected to include 32.5 GW of utility-scale solar, 8.5 GW of rooftop solar and 1.5 GW from the off-grid segment.

According to the analyst, India installed approximately 37.8 GW of solar in the year 2025, of which roughly 28.6 GW of new utility-scale solar, up 54.6% from 2024, and 7.9 GW of rooftop solar, up 72% year-on-year. The off-grid additions amounted to 1.35 GW, slightly less than the 1.48 GW in 2024.

As of December 31, 2025, the cumulative installed renewable energy capacity in India was 136 GW for solar, 55 GW for wind and 51 GW for hydro. The combined pipeline of solar, wind, hybrid and storage projects totals approximately 169 GW and is expected to come online in the next four to five years. Another 32 GW of projects are in the bidding phase, with tenders having been issued but auctions not yet completed.

The top five players in terms of cumulative installations and pipeline capacity in the utility-scale solar, wind and hybrid segments are Adani (40.4 GW), ReNew (22.2 GW), NTPC (19.6 GW), JSW Energy (16.1 GW) and Greenko (15.1 GW). Among these leading developers, Adani, ReNew, NTPC, Tata Power and Juniper Green have collectively installed approximately 5.61 GW of hybrid capacity as of December 2025.

See also  Nuclear and Solar Energy: Pros, Cons, and How They Compare (2025)

Update on the fourth quarter of 2025

In the fourth quarter of 2025, India added approximately 6.2 GW of utility-scale solar capacity, a decline of 23% from the previous quarter. The rooftop segment recorded approximately 2.1 GW of new installations, down 22% quarter-on-quarter.

Inverters
In the fourth quarter of 2025, more than 14.2 GW of inverter shipments were recorded from 15 suppliers serving both central and string inverters. Sungrow led the market with deliveries of more than 5.25 GW, mainly powered by central inverters, while retaining a significant share of string inverters.

Modules
Leading Indian module suppliers shipped approximately 14 GW in the fourth quarter of 2025. The top five companies accounted for approximately 52% of total shipments, with Waaree emerging as the market leader with a 21% share.

This content is copyrighted and may not be reused. If you would like to collaborate with us and reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Source link

approximately capacity expects India install solar SPE
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Origis is developing a 413 MW solar portfolio in West Texas

March 6, 2026

New Jersey expands state community solar program by 3 GW

March 6, 2026

How to address imbalance datasets in solar panel dust detection

March 5, 2026
Leave A Reply Cancel Reply

Don't Miss
News

China wants to add 200 GW to renewable energy sources

By solarenergyMarch 12, 20250

China wants to add 200 GW to renewable energy sources China is ready to make…

Optimizing solar EV stations for maximum impact

March 4, 2026

California recommends utilities to offer dynamic electricity prices – PV Magazine International

September 14, 2025

LDES ‘policy vacuum’ threatens Ireland’s 2030 renewable energy target

June 5, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Origis is developing a 413 MW solar portfolio in West Texas

March 6, 2026

New Jersey expands state community solar program by 3 GW

March 6, 2026

How to address imbalance datasets in solar panel dust detection

March 5, 2026

Oleic acid anti-pollution coating for solar panels – SPE

March 5, 2026
Our Picks

Origis is developing a 413 MW solar portfolio in West Texas

March 6, 2026

New Jersey expands state community solar program by 3 GW

March 6, 2026

How to address imbalance datasets in solar panel dust detection

March 5, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.