Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Lithuanian grid operators can now shut down solar power plants without cybersecurity measures

June 8, 2026

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Monday, June 8
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - News - India will only make local solar energy components mandatory from 2026
News

India will only make local solar energy components mandatory from 2026

solarenergyBy solarenergyDecember 11, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email




India will only make local solar energy components mandatory from 2026






Indian clean energy companies will only be able to use locally built solar panels from June 2026, according to a government order apparently aimed at reducing Chinese imports.

Leaders in India’s clean energy sector, including companies from conglomerates Reliance Enterprises and Tata Power, rely on Chinese suppliers as their key suppliers.

According to industry estimates, as much as 70 percent of India’s solar power generation capacity is powered by Chinese equipment.

Indian companies are already legally required to use locally made solar panels in government projects.

The new rule stipulates that only modules made from locally built photovoltaic cells, which convert light energy into electricity, can be used in projects with a bid deadline after Monday’s order.

“This condition will have to be adhered to irrespective of the date of commissioning,” the order issued by the Indian Ministry of Renewable Energy said.

The government is yet to announce the list of approved solar cell manufacturers as “the installed capacity of solar cells in the country was lower than demand”.

But “as the installed capacity of solar cells in the country is expected to increase significantly next year”, a list of approved manufacturers will now be released, the order said.

The Indian solar manufacturing space has seen rapid progress in recent years.

Solar panel production in the country is expected to reach 95 gigawatts by the end of 2025, according to a report by Bengaluru-based consultancy Mercom India.

According to the same report, India added 13.3 gigawatts of solar energy production capacity in the first half of 2024.

See also  When solar energy meets the next generation of nuclear energy – SPE

sai/gle/sn

TATA POWER COMPANY



Source link

components Energy India local mandatory solar
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Lithuanian grid operators can now shut down solar power plants without cybersecurity measures

June 8, 2026

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

Britain’s next energy dependency is already taking shape

June 5, 2026
Leave A Reply Cancel Reply

Don't Miss
Solar Industry

Czech utility unveils technology to fix solar panels in unstable ground

By solarenergyMay 28, 20240

CEZ Group has developed a new solution for securing solar photovoltaics in areas with unstable…

NorSun plans a $620 million U.S. wafer plant in Oklahoma

June 26, 2024

Res to deliver his solution EMS for 200mWh Bess

October 3, 2025

Europe’s Solar generation on the Zonne -Hit in June Heatwave -PV Magazine International

July 27, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Lithuanian grid operators can now shut down solar power plants without cybersecurity measures

June 8, 2026

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
Our Picks

Lithuanian grid operators can now shut down solar power plants without cybersecurity measures

June 8, 2026

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.