Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Sunday, June 7
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Policy - Indonesia relaxes local content requirements for solar projects – SPE
Policy

Indonesia relaxes local content requirements for solar projects – SPE

solarenergyBy solarenergyAugust 18, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Indonesia’s government has relaxed import rules for solar power plants in a bid to boost the development of renewable energy projects.

August 16, 2024 Patrick Jowett

The government of Indonesia has relaxed local content requirements for solar projects. Under the new rules, introduced earlier this month, the minimum local content requirement for solar power plants has been reduced to 20%, compared to around 40% previously.

Solar projects will also be allowed to use imported panels, provided ministerial approval is obtained, a power purchase agreement is signed before the end of the year and the plant is operational in the first half of 2026. The import window closes in June. By 2025, the panels must be purchased from companies that are willing to invest in a production facility in Indonesia.

Meanwhile, the local content requirements for hydropower plants have also been reduced and are 15% for wind power plants. The updated regulations also say that any power project that receives at least 50% financing from foreign multilateral or bilateral lenders will be exempt from local content requirements.

“We have evaluated the rules so that the renewable power plants, especially hydro, wind and solar power, can be immediately installed in our system … and further reduce our emissions,” said Jisman Hutajulu, director general of the Ministry of Energy , earlier during a press conference. this week.

Fabby Tumiwa, executive director of the Institute for Essential Services Reform, said pv magazine that he is in favor of the changes to the regulation. “It is a balanced approach to accommodate the country’s existing solar cell and module manufacturers and remove barriers to financing and installation of solar PV projects.”

See also  The crucial role of mentoring in the sector to develop leaders – SPE

Tumiwa added that according to the Indonesian government-owned energy distribution company PLN, more than 2 GWp of solar PV projects are currently unable to be implemented.

“With this regulation, these projects will continue,” Tumiwa explains. “The relaxation is limited and appears to be temporary to allow some projects, including one in Indonesia’s new capital, IKN.”

Despite Indonesia’s enormous solar potential, the use of sustainable energy is currently behind target. Last year, renewables accounted for just over 13% of Indonesia’s energy mix, falling short of the target of 17.87%.

This content is copyrighted and may not be reused. If you would like to collaborate with us and reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Source link

content Indonesia local projects relaxes requirements solar SPE
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
Leave A Reply Cancel Reply

Don't Miss
Energy Storage

Neso releases preliminary T-4 capacity market auction results

By solarenergyMarch 12, 20250

The results of the T-4 auction per fuel type. Image: Neso. The National Energy System…

Oscal launches portable storage system of 1,024 Wh – SPE

December 14, 2025

Trina pulls Sec. 337 investigative complaint against Canadian Solar

January 4, 2025

Pahal Solar will build a 2 GW solar cell and frame factory in India

October 29, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026

‘Come out from behind your screen, our industry is ultimately about people’

June 6, 2026
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.