Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Fraunhofer Isee reveals Micro-CPV module with a cost-reducing design

June 6, 2025

Birds bloom, successfully breed in the German solar parks – PV Magazine International

June 6, 2025

Circular Economy Initiatives in Solar (2025)

June 6, 2025
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Friday, June 6
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Energy Storage - Low Carbon unveils plans for 500 MW solar parks
Energy Storage

Low Carbon unveils plans for 500 MW solar parks

solarenergyBy solarenergyNovember 14, 2024No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email
If approved, construction could begin as early as 2029. Image: Andreas Gücklhorn via Unsplash

Renewable energy developer Low Carbon has announced plans for a 500MW solar and energy storage project in Kent.

The company announced yesterday (November 13) that it is in the early stages of developing the South Kent Energy Park project proposals and has begun the first phase of community outreach. The early engagement with the local community near the village of Old Romney will run from November 12 to December 20, 2024, with local people invited to share their feedback online and at in-person events during this period.

Due to its size, the 500MW project is classified as a Nationally Significant Infrastructure Project (NSIP). This means the application for a development permit must be sent to the Planning Inspectorate (PINS) before being approved by the Department for Energy Security and Net Zero (DESNZ). Low Carbon states that they expect to submit their application by the end of 2026; If approval is granted, the company expects to begin construction in 2029.

The project will combine 500 MW of solar generation capacity with a battery energy storage system (BESS), although the BESS capacity has not been disclosed.

James Hartley-Bond, project development director at Low Carbon, said: “With the delivery of South Kent Energy Park, we want to give the local community the opportunity to work with us and shape the project from an early stage of the design process.

“In addition to data from our ongoing environmental studies, we will use the feedback we receive to inform the design of the project. We develop our projects responsibly, and listening to the community is an integral part of that process.”

See also  German owners of home batteries can save the state millions with 'a maximum of six clicks' - PV Magazine International

Low Carbon has a strong 2024

Low Carbon has performed well in 2024, with several key wins that have boosted the company’s profile.

Low Carbon secured 180 MW of solar capacity during the recent Contracts for Difference (CfD) (AR6) auction round. This CfD auction round saw record success for the solar industry, with 93 ground-based solar projects with a combined capacity of 3.3 GW securing support in the auction.

The company was one of three developers awarded a Development Consent Order (DCO) as part of Energy Minister Ed Miliband’s DCO awards ceremony in July. A DCO was granted for the 500MW Gate Burton Energy Park project in Lincolnshire, in addition to Windel Energy and Canadian Solar’s 350MW Mallard Pass project and Sunnica’s 500MW solar plus storage development on the border of Suffolk and Cambridgeshire.

At the beginning of October, Low Carbon announced that it had successfully completed four large-scale solar energy projects in the United Kingdom, with a combined capacity of 133 MW. These projects include the 49.9 MW Layer Solar Farm in Essex, the 23 MW Crouch Solar Farm near Basildon, Braintree’s 35 MW Links Solar Farm and the 25 MW Maldon Wycke Solar Farm.

Source link

carbon parks plans solar unveils
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Birds bloom, successfully breed in the German solar parks – PV Magazine International

June 6, 2025

Circular Economy Initiatives in Solar (2025)

June 6, 2025

The Solar Policy Scoop: June 2025

June 6, 2025
Leave A Reply Cancel Reply

Don't Miss
Technology

Metrel launches safety tester for electrical installations for PV systems – SPE

By solarenergyNovember 5, 20240

Metrel, a Slovenian supplier of measuring equipment, says its new safety tester for electrical installations…

Southeast Asian solar panel players will be investigated again for unfair practices

May 16, 2024

Three-step process to recover lead from discarded solar panels – SPE

May 11, 2024

Navisum taps GreenPowermonitor to manage 150 MW Solar + storage fleet

June 4, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Fraunhofer Isee reveals Micro-CPV module with a cost-reducing design

June 6, 2025

Birds bloom, successfully breed in the German solar parks – PV Magazine International

June 6, 2025

Circular Economy Initiatives in Solar (2025)

June 6, 2025

The Solar Policy Scoop: June 2025

June 6, 2025
Our Picks

Fraunhofer Isee reveals Micro-CPV module with a cost-reducing design

June 6, 2025

Birds bloom, successfully breed in the German solar parks – PV Magazine International

June 6, 2025

Circular Economy Initiatives in Solar (2025)

June 6, 2025
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2025 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.