Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

InensEnergy completes 250 MW Ohio Solar Project for Microsoft

June 6, 2025

Future housing stands on the roof Zonne -Zon will be mandatory

June 6, 2025

Aerocompact introduces tool-free PV mounting system

June 6, 2025
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Friday, June 6
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - News - Primergy completes a 100 MW solar project for Amazon
News

Primergy completes a 100 MW solar project for Amazon

solarenergyBy solarenergyDecember 22, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Primergy Solar has announced its 100 MWAC solar project in Ashley County, Arkansas, is fully operational. The project, called Amazon Solar Farm Arkansas – Prairie Mist, is now delivering solar energy to the grid and marks the second project in Primergy’s portfolio to come online in 2024.

“Prairie Mist represents a step forward in our mission to develop impactful projects that benefit local communities and meet the diverse needs of our customers,” said Ty Daul, CEO of Primergy. “Achieving commercial operation is a monumental milestone for our team, and we are grateful to our partners for their support and commitment to bringing clean energy to the Arkansas region.”

Prairie Mist connects to Entergy’s transmission system in the Midcontinent Independent System Operator (MISO) operational footprint. It will provide solar energy under a power purchase agreement with Amazon and the capacity attributes will be sold to the city of North Little Rock under a 20-year contract. The solar project can generate enough energy to power the equivalent of approximately 22,000 homes per year and improves Arkansas’ energy generation mix and energy independence by reducing dependence on carbon-emitting resources.

Primergy engaged Primoris Renewable Energy, a leading utility-scale solar contractor, as the engineering, procurement and construction partner for the project. Prairie Mist created approximately 200 construction jobs and is expected to contribute approximately $10 million in tax benefits to Ashley County over the term. In addition to the construction and tax credits, Primergy is supporting the community by building an ADA-accessible playground and shade structure at the local high school, Hamburg High School.

See also  Solar panels above highways can significantly reduce emissions and increase road safety

During the development of the project, Primergy closed $300 million in debt and tax financing for construction and development in 2023 with debt facilities led by SMBC as transaction agent, Norddeutsche Landesbank Girozentrale, Societe Generale and Crédit Agricole Corporate and Investment Bank. The tax equity investment was led by PNC Bank.

News item from Primergy Solar

Source link

Amazon completes Primergy project solar
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

InensEnergy completes 250 MW Ohio Solar Project for Microsoft

June 6, 2025

New pollution room for testing dust structure in solar modules – PV Magazine International

June 6, 2025

Until UK Solar Acquisition sites unveiled

June 6, 2025
Leave A Reply Cancel Reply

Don't Miss
News

Standard Solar, WCP Solar completes 1 MW municipal network in Illinois

By solarenergySeptember 18, 20240

Standard solar energya commercial and community solar developer and owner, completed construction on its first…

Ireland is in line for a 1 GWh iron-air battery storage project – SPE

September 27, 2024

Kongres PV, Warsaw – SPE

May 30, 2024

ATMOCE launches Retrofit-ready home battery

May 7, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

InensEnergy completes 250 MW Ohio Solar Project for Microsoft

June 6, 2025

Future housing stands on the roof Zonne -Zon will be mandatory

June 6, 2025

Aerocompact introduces tool-free PV mounting system

June 6, 2025

EDF taps Wärtsilä for two more British battery storage projects

June 6, 2025
Our Picks

InensEnergy completes 250 MW Ohio Solar Project for Microsoft

June 6, 2025

Future housing stands on the roof Zonne -Zon will be mandatory

June 6, 2025

Aerocompact introduces tool-free PV mounting system

June 6, 2025
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2025 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.