Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

HEWER launches a pre-cassembled unit for Retrofit from Heat Pomp, Installatie-PV Magazine International

June 6, 2025

GASSPIJPLEMENT COMPETITION COMMITTESS 130-MW TEXAS SOLAR PROJECT

June 6, 2025

Fraunhofer Isee reveals Micro-CPV module with a cost-reducing design

June 6, 2025
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Friday, June 6
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - News - Root-Power obtains construction permit for 12MW battery storage
News

Root-Power obtains construction permit for 12MW battery storage

solarenergyBy solarenergySeptember 17, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email
The Root-Power team consulted with AONB officials and local conservation groups before submitting the planning application in late 2023. Image: Root-Power.

YLEM Energy arm Root-Power, which launched earlier this year, has been granted planning permission for a 12MW/48MWh battery energy storage site in Caterham, Surrey.

The 4-hour Tillingdown Farm site, expected to go live in 2025, is located in both the green belt and the Surrey Hills Area of ​​Outstanding Natural Beauty (AONB). As such, the development process was “exhaustive” and the Root-Power team consulted with AONB officials and local conservation groups before submitting the planning application in late 2023.

The planning application was supported by an Alternative Site Assessment (ASA) and Greenbelt Justification Report, which excluded other sites. The report concluded that there were no other suitable locations outside the AONB or green belt.

The development site has also been designated as one of Britain’s 56 ‘Habitats of Principle Importance’ (HPI). As such, Root-Power had to demonstrate that the existing habitat was replaceable before development planning could progress.

As a result, the 12MW battery energy storage development will be one of the first in the country (and the first for Tandridge Council, which approved the project) to be consented on the condition that off-site biodiversity units are secured: Root -Power will secure off-site biodiversity units through a habitat bank.

Neil Brooks, managing director of Root-Power, said: “Due to the project’s unique combination of planning constraints, it was a challenging project to obtain planning permission and we are pleased to have been able to obtain this consent through a delegated decision. without the need for an appeal.”

Root-Power enters the British BESS market

Root-Power is YLEM Energy’s specialized battery energy storage system (BESS) owner-operator focused on business energy generation. It was launched in July this year, with a pipeline of 40 projects ranging in size from 11 MW to 100 MW.

See also  Amea Power starts construction of a 120 MW solar power plant in Tunisia – SPE

One of the largest projects in the pipeline, the 100MW/200MWh Granborough Project in Buckinghamshire, has already reached the advanced development stage of the planning process.

The company shows no signs of slowing down and earlier this month submitted planning applications for a further five BESS projects with a capacity of 210 MW. Getting through the planning process is clearly not an issue for the developer, with Brooks noting that Tillingdown’s consent proves Root-Power’s ability to obtain planning permission for renewable energy projects in the most challenging environments.

Source link

12MW battery construction obtains permit RootPower storage
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

GASSPIJPLEMENT COMPETITION COMMITTESS 130-MW TEXAS SOLAR PROJECT

June 6, 2025

House of Lords: Government in danger to missing CP2030 target

June 5, 2025

Which developers are still wrong with battery risk – PV Magazine International

June 5, 2025
Leave A Reply Cancel Reply

Don't Miss
Policy

Qcells secures $1.45 billion in DoE support for solar power plants in Georgia – SPE

By solarenergyDecember 24, 20240

The U.S. Department of Energy (DoE) has completed a $1.45 billion loan guarantee to Hanwha…

Croatia launches auctions for 607 MW of solar, wind and hydropower – SPE

April 26, 2024

Origis completes Mississippi solar + storage project for TVA

May 30, 2024

Ingedam to present 5.4 MW central inverter, new string-ominer system at Intersolar Europe

May 1, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

HEWER launches a pre-cassembled unit for Retrofit from Heat Pomp, Installatie-PV Magazine International

June 6, 2025

GASSPIJPLEMENT COMPETITION COMMITTESS 130-MW TEXAS SOLAR PROJECT

June 6, 2025

Fraunhofer Isee reveals Micro-CPV module with a cost-reducing design

June 6, 2025

Birds bloom, successfully breed in the German solar parks – PV Magazine International

June 6, 2025
Our Picks

HEWER launches a pre-cassembled unit for Retrofit from Heat Pomp, Installatie-PV Magazine International

June 6, 2025

GASSPIJPLEMENT COMPETITION COMMITTESS 130-MW TEXAS SOLAR PROJECT

June 6, 2025

Fraunhofer Isee reveals Micro-CPV module with a cost-reducing design

June 6, 2025
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2025 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.