Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Origis is developing a 413 MW solar portfolio in West Texas

March 6, 2026

New Jersey expands state community solar program by 3 GW

March 6, 2026

How to address imbalance datasets in solar panel dust detection

March 5, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Friday, March 6
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Solar Industry - Tata Power’s Tirunelveli fab will start making solar cells from June
Solar Industry

Tata Power’s Tirunelveli fab will start making solar cells from June

solarenergyBy solarenergyMay 19, 2024No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Praveer Sinha, CEO and managing director of Tata Power, says the company’s 4 GW solar cell factory in the Indian state of Tamil Nadu will be commissioned from next month. Over a period of three months it will reach a peak production capacity of 4 GW.

May 16, 2024 Uma Gupta

By pv magazine India

Praveer Sinha, CEO and managing director of Tata Power, said the company’s 4 GW solar cell manufacturing facility in Tamil Nadu’s Tirunelveli district will begin the commissioning process from June.

The facility will stabilize and reach a peak production capacity of 4 GW over a three-month period. The company has already commissioned its 4 GW PV module manufacturing facility in Tirunelveli, which is now fully operational.

The Tirunelveli plant will cater to Tata Power’s own needs, especially for projects with Domestic Content Requirements (DCR) obligations.

“We are only setting up this factory to meet DCR obligations for domestic use. We will do that too [also] we can use it for our own utility scale group, but also for roofs if that suits us [with the launch of the PM Surya Ghar Yojana program]” said Sinha.

Tata Power claims to have a share of almost 20% in the domestic rooftop solar market. It wants to maintain its leading position because it is part of the government subsidy scheme for solar energy on residential roofs.

“The most important advantage [of the government scheme for residential rooftop solar] is for consumers who use 1 kW, 2 kW or 3 kW of solar energy on the roof. The trend we have seen based on the people who have registered, the first household of one crore, more of that is 3 kW and 2 kW. So what we can expect is an average of about 2.5. So it means around 25 to 30 GW of rooftops need to be deployed in the next three to four years,” Sinha said.

See also  Avangrid hires 5,000 sheep to graze on two solar projects in the Pacific Northwest

As the company pursues better returns at the utility scale, it is focusing on tenders for both hybrid and fixed-duration renewable energy projects (FDRE), rather than pure solar or wind.

“[Last year] we have won a large volume of business, mainly through hybrid or FDRE-based bidding. We expect that there will also be many such bids this year, both hybrid and those with only solar energy, wind energy and BESS. And we will actively participate in all these projects,” Sinha said. ‘Since this [projects] are not very complex, there wouldn’t be too many players who would have the ability to carry out projects like this, and therefore we will be in a much better position to submit better bids and also win with much better margins.”

This content is copyrighted and may not be reused. If you would like to collaborate with us and reuse some of our content, please contact: editors@pv-magazine.com.

Source link

cells fab June making powers solar start Tata Tirunelveli
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Origis is developing a 413 MW solar portfolio in West Texas

March 6, 2026

New Jersey expands state community solar program by 3 GW

March 6, 2026

How to address imbalance datasets in solar panel dust detection

March 5, 2026
Leave A Reply Cancel Reply

Don't Miss
Technology

Xpanner launches Robotic Automation Kit to Retrofit Solar Pile Drivers Retrofit – PV Magazine International

By solarenergySeptember 23, 20250

The American startup offers a new kit to integrate robot automation with existing equipment. September…

Nine-year EL tests on 85,000 PV modules reveal increasing presence of edge ribbon cracks

November 15, 2024

Avaada Building 5 GW Solar Cell Plant, opens 1.5 GW Module Factory in India

March 11, 2025

Chinese scientists develop photovoltaic window with heat flow control – SPE

December 2, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Origis is developing a 413 MW solar portfolio in West Texas

March 6, 2026

New Jersey expands state community solar program by 3 GW

March 6, 2026

How to address imbalance datasets in solar panel dust detection

March 5, 2026

Oleic acid anti-pollution coating for solar panels – SPE

March 5, 2026
Our Picks

Origis is developing a 413 MW solar portfolio in West Texas

March 6, 2026

New Jersey expands state community solar program by 3 GW

March 6, 2026

How to address imbalance datasets in solar panel dust detection

March 5, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.