Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Sunday, June 7
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - News - Telis Energy UK unveils its first NSIP plans
News

Telis Energy UK unveils its first NSIP plans

solarenergyBy solarenergyJanuary 13, 2025No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email
The indicative development area covers 2,400 hectares of agricultural land north-west of Leadenham, Lincolnshire. Image: Leoda solar park.

Green energy company Telis Energy UK has unveiled plans for its first large-scale solar development requiring a development consent order (DCO).

Telis Energy UK is part of the Telis Energy Group, a European green energy development platform established in 2022 and targeting a development pipeline of 10 GW by 2030, delivered through four subsidiaries in France, the United Kingdom, Germany and Italy.

The UK subsidiary’s solar power plant proposals, called Leoda Solar Farm, would deliver a generation capacity of 500MW to 600MW, combined with a battery energy storage system (BESS) of an as yet undisclosed capacity.

The scale of the development means it is classified as a Nationally Important Infrastructure Project (NSIP) and will therefore have to undergo a rigorous planning process and ultimately be approved by Energy Secretary Ed Miliband.

The non-statutory consultation for the project will formally start on January 23 and will last six weeks. According to Telis, the development will be “landscape-driven” with a design that prioritises “enhancing local biodiversity, preserving the natural character of the area and promoting coexistence between renewable energy infrastructure and the surrounding landscape” .

The indicative development area covers 2,400 hectares of agricultural land north-west of Leadenham, Lincolnshire. The specific land area has been chosen so that development can benefit from natural screening. Telis said it will also plant native hedges and trees.

Telis also points to the existence of other local renewable energy projects, which it would “coordinate and collaborate with” to minimize cumulative impacts.

Lincolnshire NSIP Projects

The area is linked to several major solar projects, with EDF Renewables and Luminous Energy’s 800MW Springwell Solar Farm currently in the preliminary investigation phase.

See also  Bill approves the legislative power of California to create the Western regional electricity market

In February 2024, developer Downing Renewable Developments (DRD) unveiled plans to develop a 750MW solar and co-located storage project in Lincolnshire. A DCO application for the Meridian Solar project is expected to be submitted in the third quarter of 2025.

The Mallard Pass solar power plant, developed by Windel Energy and Canadian Solar, received a DCO from the Minister of Energy shortly after the July election. It is expected to generate around 350MW of solar energy and cover 880 hectares of land on either side of the East Coast Main Line near Essendine, partly in South Kesteven in Lincolnshire and partly in Rutland.

The Beacon Fen Energy Park, a 400MW solar PV power plant co-located with a 600MW battery energy storage system (BESS) under development by Low Carbon, is expected to submit a DCO application in March this year.

Nearby, in Nottinghamshire, Elements Green is taking a similar nature-focused approach to Telis with its 800MW Great North Road Solar and Biodiversity Park, for which the second round of statutory consultation has been launched.

Source link

Energy NSIP plans Telis unveils
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Britain’s next energy dependency is already taking shape

June 5, 2026

ComEd starts a new energy pilot with a solar rebate on the roof of a brewery

June 5, 2026

Malaysia expects to reach 29.7 GW of solar energy by 2035

June 5, 2026
Leave A Reply Cancel Reply

Don't Miss
News

Scottish council approves solar power for National Air Traffic Services site

By solarenergyNovember 22, 20240

NATS has already installed rooftop solar in central Swanwick, pictured above. Image: NATS. South Ayrshire…

Kentucky’s first 100% solar-powered factory uses Stracker Solar systems

May 31, 2024

Arevon is breaking ground on a 228 MW solar project in Indiana

May 20, 2024

Italy, Portugal, Spain Break Daily Solar Production Records – PV Magazine International

July 5, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026

‘Come out from behind your screen, our industry is ultimately about people’

June 6, 2026
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.