Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Pennsylvania passes law establishing solar decommissioning plans

July 21, 2026

Nominations open for Solar Builder’s Project of the Year Awards 2026

July 21, 2026

The British Army commissions a 1.7 GWh PV project at Larkhill Garrison

July 21, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Tuesday, July 21
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Energy Storage - The British Army commissions a 1.7 GWh PV project at Larkhill Garrison
Energy Storage

The British Army commissions a 1.7 GWh PV project at Larkhill Garrison

solarenergyBy solarenergyJuly 21, 2026No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

The British Army has commissioned a new ground-mounted solar PV installation at Larkhill Garrison in Wiltshire, which is expected to generate around 1.7 GWh of electricity annually.

The installation covers 2.5 hectares and includes more than 4,000 PV panels. The excess electricity will be exported via a private wire network serving Bulford, Tidworth and Perham Down military camps.

Major General AJ Smith CBE, Director of Bases & Infrastructure and Army Sustainability Champion, said: “This project shows what is possible when we invest in practical, scalable renewable energy. By increasing our green energy supply, we are building an Army estate that is more sustainable, resilient and better able to support operational capability.”

The project is part of the Army’s Project Prometheus programthat deploys rooftop and ground-mounted solar PV systems at suitable locations across the Army’s estate. It was delivered by Aspire Defense Services on behalf of the Defense Infrastructure Organization (DIO).

Related:The hotel’s £300,000 solar and storage installation motivated by energy prices and sustainability expectations

So is the Ministry of Defense worked with Great British Energy to deploy solar energy across all its sites.

The commissioning follows an expansion of solar capacity at Larkhill this year with the addition of the ground-mounted array and four rooftop PV installations.

James Clare, director of energy, environment and infrastructure at the Ministry of Defence, said: “This project demonstrates the practical benefits of investing in scalable energy solutions. By increasing our renewable energy capacity, we reduce costs, increase the resilience of estates and support a more sustainable and operationally effective estate.”

See also  Liberia seeks consultants for a 20 MW solar project – SPE

The Army said the increased PV capacity allowed the garrison to become energy self-sufficient for 73 days during peak daylight hours, while exporting excess electricity to Bulford Camp.

In 2023, the The British Army has commissioned a 3,000-panel solar PV farm at the Duke of Gloucester Barracks in South Cerney. The 1.1 hectare installation became the Defense Estate’s third operational solar site and was expected to generate around a third of the barracks’ electricity demand, contributing to an estimated annual saving of £250,000 across the three operational sites.

The project was completed by sustainable energy installer 3ti. It followed the Army’s first solar farm, a 2.3MW installation at the Defense School of Transport in Leconfield, completed by Centrica Business Solutions in 2021, and the Baker Barracks solar project on Thorney Island, which was completed by 3ti in February 2022.

Related:UK solar installations continue to rise while costs per kW fall



Source link

army British Commissions Garrison GWh Larkhill project
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Nominations open for Solar Builder’s Project of the Year Awards 2026

July 21, 2026

British hotel invests £300,000 in solar and storage amid price pressure

July 20, 2026

UK solar developers are considering the ‘ready-to-repower’ phase

July 17, 2026
Leave A Reply Cancel Reply

Don't Miss
Energy Storage

Iron-Natrium Battery to back up the fire-sensitive community in California-PV Magazine International

By solarenergyJuly 28, 20250

The US Department of Energy has awarded $ 4.1 million to Inpyte Energy to use…

How America plays gunboat diplomacy against itself

December 16, 2025

Space Solar Teams with Magdrive to stimulate in-orbit solar energy systems

March 22, 2025

British startup launches AI air heat pump for homes – SPE

November 7, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Pennsylvania passes law establishing solar decommissioning plans

July 21, 2026

Nominations open for Solar Builder’s Project of the Year Awards 2026

July 21, 2026

The British Army commissions a 1.7 GWh PV project at Larkhill Garrison

July 21, 2026

Scales of sodium storage

July 21, 2026
Our Picks

Pennsylvania passes law establishing solar decommissioning plans

July 21, 2026

Nominations open for Solar Builder’s Project of the Year Awards 2026

July 21, 2026

The British Army commissions a 1.7 GWh PV project at Larkhill Garrison

July 21, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.