Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

InensEnergy completes 250 MW Ohio Solar Project for Microsoft

June 6, 2025

Future housing stands on the roof Zonne -Zon will be mandatory

June 6, 2025

Aerocompact introduces tool-free PV mounting system

June 6, 2025
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Friday, June 6
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - News - DCO decision on 500 MW solar park postponed until 2025
News

DCO decision on 500 MW solar park postponed until 2025

solarenergyBy solarenergyOctober 15, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email
A map of the proposed development. Image: Ecotricity

The Department for Energy Security and Net Zero (DESNZ) has announced it will delay the planning decision for a major proposed solar farm until 2025.

The Heckington Fen Solar Park is a proposed 500 MW development by Ecotricity. In August, the developers requested an extension of the statutory deadline for providing information to DESNZ, stating it needed more time to negotiate with the landowners over the site, the Crown Estate and the Duchy of Lancaster. DESNZ granted an extension until September 27, but on September 11 the developers again requested an extension until January 6, 2025.

As a result, Secretary of State for Energy Ed Miliband has now granted the developers an extension until January 24, 2025, a decision the department said was made “reluctantly”. Ecotricity, the Crown Estate and the Duchy of Lancaster must now provide evidence that an agreement was reached between the parties within the specified timeframe.

In announcing this decision, DESNZ stressed that this does not indicate the project is more likely to be approved or refused. might be or what final conclusions the Secretary of State might draw on a particular issue relevant to the assessment of the application.

The Heckington Fen Solar Farm, located near the village of Heckington in North Kesteven, Lincolnshire, will combine 500 MW of solar generation capacity with a co-located battery energy storage system (BESS) of approximately 200-400 MW. The proposed design plans to use double-sided solar panels to harvest as much sunlight as possible. As Lincolnshire is one of the sunniest locations in the country, the site could avoid as much as 75,000 tonnes of CO2 emissions every year.

See also  Lithuania bans Chinese remote access to solar, wind and storage equipment – ​​SPE

The site has an expected lifespan of 40 years, after which it will be converted back into pasture. The proposed layout includes planting native hedgerows and wildflowers to encourage the presence of bees and other pollinators in the area.

Source link

DCO Decision park postponed solar
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

InensEnergy completes 250 MW Ohio Solar Project for Microsoft

June 6, 2025

New pollution room for testing dust structure in solar modules – PV Magazine International

June 6, 2025

Until UK Solar Acquisition sites unveiled

June 6, 2025
Leave A Reply Cancel Reply

Don't Miss
Carbon Credit

The $100 billion carbon market could drive annual investment in $700 billion projects • Carbon Credits

By solarenergyJune 26, 20240

A new report from BeZero Carbon, a carbon assessment company, reveals that a $100 billion…

Longi introduces HPBC 2.0 modules in China’s first distributed solar project – SPE

December 9, 2024

Hydronically closed cooling system for photovoltaic modules

August 6, 2024

Longi unveils heterojunction BC solar cells with 27.3% efficiency

November 18, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

InensEnergy completes 250 MW Ohio Solar Project for Microsoft

June 6, 2025

Future housing stands on the roof Zonne -Zon will be mandatory

June 6, 2025

Aerocompact introduces tool-free PV mounting system

June 6, 2025

EDF taps Wärtsilä for two more British battery storage projects

June 6, 2025
Our Picks

InensEnergy completes 250 MW Ohio Solar Project for Microsoft

June 6, 2025

Future housing stands on the roof Zonne -Zon will be mandatory

June 6, 2025

Aerocompact introduces tool-free PV mounting system

June 6, 2025
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2025 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.