Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Zendure launches battery ranges for residential PV – SPE

April 23, 2026

The CFO’s Guide To Nature Based Solutions

April 23, 2026

Inside PV Manufacturing: Belga Solar’s module factory in Belgium

April 23, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Thursday, April 23
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - News - DCO decision on 500 MW solar park postponed until 2025
News

DCO decision on 500 MW solar park postponed until 2025

solarenergyBy solarenergyOctober 15, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email
A map of the proposed development. Image: Ecotricity

The Department for Energy Security and Net Zero (DESNZ) has announced it will delay the planning decision for a major proposed solar farm until 2025.

The Heckington Fen Solar Park is a proposed 500 MW development by Ecotricity. In August, the developers requested an extension of the statutory deadline for providing information to DESNZ, stating it needed more time to negotiate with the landowners over the site, the Crown Estate and the Duchy of Lancaster. DESNZ granted an extension until September 27, but on September 11 the developers again requested an extension until January 6, 2025.

As a result, Secretary of State for Energy Ed Miliband has now granted the developers an extension until January 24, 2025, a decision the department said was made “reluctantly”. Ecotricity, the Crown Estate and the Duchy of Lancaster must now provide evidence that an agreement was reached between the parties within the specified timeframe.

In announcing this decision, DESNZ stressed that this does not indicate the project is more likely to be approved or refused. might be or what final conclusions the Secretary of State might draw on a particular issue relevant to the assessment of the application.

The Heckington Fen Solar Farm, located near the village of Heckington in North Kesteven, Lincolnshire, will combine 500 MW of solar generation capacity with a co-located battery energy storage system (BESS) of approximately 200-400 MW. The proposed design plans to use double-sided solar panels to harvest as much sunlight as possible. As Lincolnshire is one of the sunniest locations in the country, the site could avoid as much as 75,000 tonnes of CO2 emissions every year.

See also  UKPN Services acquires solar, wind and hydropower portfolio from SEEIT

The site has an expected lifespan of 40 years, after which it will be converted back into pasture. The proposed layout includes planting native hedgerows and wildflowers to encourage the presence of bees and other pollinators in the area.

Source link

DCO Decision park postponed solar
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Solar energy’s rebound effect could increase European electricity demand by 5% by 2050 – SPE

April 23, 2026

Repowering key for Japanese solar assets nears end of feed-in tariff – SPE

April 23, 2026

The largest floating solar panel in the Maldives goes online – SPE

April 23, 2026
Leave A Reply Cancel Reply

Don't Miss
News

Hkust promotes nano scale research to improve the efficiency of the perovskite solar cell

By solarenergyMarch 7, 20250

Hkust promotes nano scale research to improve the efficiency of the perovskite solar cell The…

Revolv Space is preparing for the inaugural on-orbit test of the SARA system

November 28, 2024

Pivot Energy is completing a solar portfolio of more than 22 MW in Upstate New York

June 5, 2024

PS Renewable Energy Branden permission for solar project after appeal

January 29, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Zendure launches battery ranges for residential PV – SPE

April 23, 2026

The CFO’s Guide To Nature Based Solutions

April 23, 2026

Inside PV Manufacturing: Belga Solar’s module factory in Belgium

April 23, 2026

Solar energy’s rebound effect could increase European electricity demand by 5% by 2050 – SPE

April 23, 2026
Our Picks

Zendure launches battery ranges for residential PV – SPE

April 23, 2026

The CFO’s Guide To Nature Based Solutions

April 23, 2026

Inside PV Manufacturing: Belga Solar’s module factory in Belgium

April 23, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.