Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Distributed solar capacity in Argentina grew by 34.5% in the first half of the year

July 23, 2026

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

Cornwall Insight cuts price ceiling forecast after Burnham’s VAT cut

July 22, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Thursday, July 23
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - News - DCO decision on 500 MW solar park postponed until 2025
News

DCO decision on 500 MW solar park postponed until 2025

solarenergyBy solarenergyOctober 15, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email
A map of the proposed development. Image: Ecotricity

The Department for Energy Security and Net Zero (DESNZ) has announced it will delay the planning decision for a major proposed solar farm until 2025.

The Heckington Fen Solar Park is a proposed 500 MW development by Ecotricity. In August, the developers requested an extension of the statutory deadline for providing information to DESNZ, stating it needed more time to negotiate with the landowners over the site, the Crown Estate and the Duchy of Lancaster. DESNZ granted an extension until September 27, but on September 11 the developers again requested an extension until January 6, 2025.

As a result, Secretary of State for Energy Ed Miliband has now granted the developers an extension until January 24, 2025, a decision the department said was made “reluctantly”. Ecotricity, the Crown Estate and the Duchy of Lancaster must now provide evidence that an agreement was reached between the parties within the specified timeframe.

In announcing this decision, DESNZ stressed that this does not indicate the project is more likely to be approved or refused. might be or what final conclusions the Secretary of State might draw on a particular issue relevant to the assessment of the application.

The Heckington Fen Solar Farm, located near the village of Heckington in North Kesteven, Lincolnshire, will combine 500 MW of solar generation capacity with a co-located battery energy storage system (BESS) of approximately 200-400 MW. The proposed design plans to use double-sided solar panels to harvest as much sunlight as possible. As Lincolnshire is one of the sunniest locations in the country, the site could avoid as much as 75,000 tonnes of CO2 emissions every year.

See also  Vaisala launches a new weather-based decision-making platform for renewable energy

The site has an expected lifespan of 40 years, after which it will be converted back into pasture. The proposed layout includes planting native hedgerows and wildflowers to encourage the presence of bees and other pollinators in the area.

Source link

DCO Decision park postponed solar
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Distributed solar capacity in Argentina grew by 34.5% in the first half of the year

July 23, 2026

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

SmartestEnergy, Greentech ink CfD PPA for the Kent solar project

July 22, 2026
Leave A Reply Cancel Reply

Don't Miss
News

SSE wins TfL contract to power London tube with solar energy

By solarenergyMarch 4, 20260

Transport for London (TfL) has selected SSE Energy Solutions to supply dedicated solar energy to…

Axis Solar installs Solar on 6 Texas Charter School buildings

April 19, 2025

Italy added 4.8 GW of solar energy from January to October, says grid operator – SPE

November 14, 2025

German energy supplier to build 4 MW Air Source heat pump-PV Magazine International

July 22, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Distributed solar capacity in Argentina grew by 34.5% in the first half of the year

July 23, 2026

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

Cornwall Insight cuts price ceiling forecast after Burnham’s VAT cut

July 22, 2026

SmartestEnergy, Greentech ink CfD PPA for the Kent solar project

July 22, 2026
Our Picks

Distributed solar capacity in Argentina grew by 34.5% in the first half of the year

July 23, 2026

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

Cornwall Insight cuts price ceiling forecast after Burnham’s VAT cut

July 22, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.