Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Tesla launches three-phase Powerwall 3P – SPE

April 23, 2026

Why the UK solar industry needs to own its safety story

April 23, 2026

Fraunhofer ISE develops colored film technology for patterned solar panels

April 23, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Thursday, April 23
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - News - Enso Energy has given the green light for a 49.9 MW solar park in Hampshire
News

Enso Energy has given the green light for a 49.9 MW solar park in Hampshire

solarenergyBy solarenergyNovember 5, 2024No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email
The development will take place on eight plots in the south of England. Image: Oskar Kadaksoo via Unsplash.

Solar energy developer Enso Energy has received planning permission from two councils for a 49.9 MW solar power plant in the south of England.

The Denmead Solar Farm, located on 87 hectares of land under the jurisdiction of East Hampshire County Council and Winchester City Council, has been approved by both relevant bodies for an operational life of 40 years. Although initial proposals for the project, submitted in 2022, included plans for a battery energy storage system (BESS), this was dropped in the ultimately approved development plan after consultants raised concerns about the fire risk of BESS systems and the potential for groundwater contamination if the system were to fail.

Following the approval of the development, further conditions for the approval of the plan have been set by East Hampshire County Council. These include preparing a management plan for remedial measures in the event of a solar panel failure to prevent groundwater contamination and conducting a post-installation noise assessment within three months of the project coming into service.

According to Enso Energy, the development will deliver a net biodiversity gain of 56%, and will allow sheep grazing to continue under and around the 91,840 solar panels that will be installed on the eight plots in the development.

Although a start date for construction has not yet been announced, Enso Energy states that construction will take seven months. The solar power plant will be connected to the local Lovedean substation.

According to local news reports, councilors’ views were initially mixed on the development proposals, with councilor Nick Drew criticizing the development as an “industrialisation of the countryside” and councilor David Ashcroft stating: “We have to do it, it’s very important.” .

See also  Citing the recent surge in imports, US solar panel manufacturers are calling on the government for immediate assistance

A strong year for Enso Energy

This is not the first planning victory that Enso Energy has achieved this year. In July, Secretary of State Matthew Pennycook granted planning permission for the 23MW Honiley Road Solar Farm after it was “revoked” by the previous Secretary of State. The development also includes a 57 MW BESS.

Enso Energy also enjoyed great success during the most recent Contracts for Difference (CfD) auction round, Allocation Round 6 (AR6). The developer has secured CfDs for four of its solar projects, totaling 164 MW. AR6 set new records for the solar industry, with 93 ground-based solar projects totaling 3.3 GW of capacity upon landing during the auction round. Solar achieved a strike price of £50.07/MWh for AR6, well above the £47/MWh of AR5.

Source link

Energy Enso Green Hampshire light park solar
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Why the UK solar industry needs to own its safety story

April 23, 2026

Fraunhofer ISE develops colored film technology for patterned solar panels

April 23, 2026

The federal court has halted Trump administration orders that hinder solar and wind energy development

April 23, 2026
Leave A Reply Cancel Reply

Don't Miss
News

Enphase to market bidirectional EV charger next year

By solarenergySeptember 10, 20250

Enphase Energy has revealed its new one today IQ Bidirectional EV -charger Architecture for vehicle-to-home…

Nevados overhauls the latest All Terrain Tracker in time for RE+

September 5, 2024

UNSW researchers identify a new moist heat-induced failure mechanism in TOPCon solar panels

February 2, 2026

Panasonic expands the factory from air to water heat pump in the Czech Republic

September 1, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Tesla launches three-phase Powerwall 3P – SPE

April 23, 2026

Why the UK solar industry needs to own its safety story

April 23, 2026

Fraunhofer ISE develops colored film technology for patterned solar panels

April 23, 2026

Thermoacoustic heat pumps are on the verge of commercial breakthrough – SPE

April 23, 2026
Our Picks

Tesla launches three-phase Powerwall 3P – SPE

April 23, 2026

Why the UK solar industry needs to own its safety story

April 23, 2026

Fraunhofer ISE develops colored film technology for patterned solar panels

April 23, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.