Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Monday, June 8
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Finance - Finland will build seven solar power plants with a total capacity of 213 MW – SPE
Finance

Finland will build seven solar power plants with a total capacity of 213 MW – SPE

solarenergyBy solarenergyJune 1, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Solar energy projects across Finland have been given the green light after grant agreements were signed with the European Executive Agency for Climate, Infrastructure and the Environment. A total of €27.5 million ($29.8 million) will be invested in the projects through the EU’s renewable energy financing mechanism.

May 31, 2024 Patrick Jowett

Image: Mariana Proença/Unsplash

The European Executive Agency for Climate, Infrastructure and Environment (CINEA) has signed grant agreements with seven solar projects in Finland with a combined capacity of 212.99 MW.

A total of €27.5 million will be invested in the projects through the EU’s renewable energy financing mechanism, following successful bids in the EU’s first cross-border solar tender held last year.

The projects include two projects in the South Ostrobothnia region of Western Finland: a 74.03 MW plant on an area currently used for peat production and a 33 MW plant in a peat bog. Elsewhere, a 20 MW ground-mounted solar farm in Loukkaanaro will become the largest solar project in Northern Finland, expected to last at least 30 years.

The other funded projects include a 40.16 MW site in Pöytyä, Southwest Finland, a 30 MW park in the municipality of Tohmajärvi, located in the North Karelia region of eastern Finland, an 8 MW factory in the municipality Nivala, Central Finland, and a 7.8 MW Installation in the city of Savonlinna, Eastern Finland.

Several projects have been given separate completion dates in 2025.

According to figures from the International Renewable Energy Agency, Finland had deployed 900 MW of solar energy by the end of 2023, up from 664 MW the year before.

See also  DIY Solar Projects for Homeowners (2025)

This content is copyrighted and may not be reused. If you would like to collaborate with us and reuse some of our content, please contact: editors@pv-magazine.com.

Source link

build capacity Finland plants power solar SPE total
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

Letter from China’s PV Industry: Arctech wins 2.1 GW solar deal

June 5, 2026

ComEd starts a new energy pilot with a solar rebate on the roof of a brewery

June 5, 2026
Leave A Reply Cancel Reply

Don't Miss
Energy Storage

Clean Power Hydrogen launches membraneless electrolyzers – SPE

By solarenergyMay 30, 20240

Clean Power Hydrogen (CPH2) launches membraneless electrolyzers with cryogenic systems to separate hydrogen and oxygen.…

Era of electrification exposing Australia’s weakest link

June 6, 2026

California Fast tracks that allow Gigawatt scale Solar + Storage project in Fresno County

June 12, 2025

Rooftop solar rates in Australia fall below linear average – SPE

October 8, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026

‘Come out from behind your screen, our industry is ultimately about people’

June 6, 2026
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.