Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Tesla launches three-phase Powerwall 3P – SPE

April 23, 2026

Why the UK solar industry needs to own its safety story

April 23, 2026

Fraunhofer ISE develops colored film technology for patterned solar panels

April 23, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Thursday, April 23
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - News - Centrica and Push Power install tailor-made PV for David Lloyd Leisure
News

Centrica and Push Power install tailor-made PV for David Lloyd Leisure

solarenergyBy solarenergyNovember 6, 2024No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email
David Lloyd Leisure’s Dartford site (pictured) was one of the locations selected for a solar installation. Image: Pushing force.

Centrica Business Solutions and solar PV developer Push Power have completed the installation of solar PV systems at ten David Lloyd Leisure Clubs across the UK.

Centrica, the parent company of British Gas, contracted Push Power to design and install the roof-mounted PV systems. The first wave of installations took place at David Lloyd clubs in Basildon, Solihull, Southampton, Birmingham, Hull, Cardiff, Cambridge, Dartford, West Bridgford and Manchester, and the company notes that more locations will follow in the future. Nine of the ten installations are already operational and the Manchester site will be powered up next week.

The installations varied in size, from a 300 kWp installation with 708 panels in Manchester to a 631 kWp installation with 1485 panels in Cambridge. JA Solar supplied panels for all locations, while SolarEdge supplied the inverter and optimization equipment.

Nick Mingo, head of real estate and sustainability CAPEX at David Lloyd Clubs, said: “We have been working on a range of initiatives, including generating our own renewable energy on site, as part of our target to become net zero carbon by 2030. We are impressed with Centrica Business Solutions and Push Power and look forward to working with them throughout the remainder of the project.”

Noting the increasing attractiveness of solar installations for businesses, Christian Stella, UK&I director at Centrica Business Solutions commented: “the pressure to decarbonise and reduce costs is greater than ever and businesses are turning to on-site generation methods , such as solar energy.”

On-site solar energy for companies is becoming increasingly popular

The installations at David Lloyd Leisure Clubs are the latest in a growing number of businesses choosing to reduce their energy costs and carbon emissions with an on-site solar PV array.

See also  Ampeak ensures the planning for 1,250mWh AW2 Bess

In late September, luxury vehicle manufacturer Jaguar Land Rover (JLR) announced it would install an array of 18,000 solar panels at its flagship factory in Halewood – enough to cover 10% of the site’s energy consumption.

Earlier that month, biotech company Fera Science appointed electrical specialist Meson Electrical to design and install a bespoke 150 kWp installation for its York Biotech Campus, consisting of 342 N-Type solar panels. The two companies estimate that Fera Science will save around £24,000 on its energy bills each year once the installation is complete.

GB NRG has also been busy and announced in August that it had successfully completed the installations at all Crendon Timber’s 15 sites, with a combined capacity of 2MW. The expected payback period for the solar installations is expected to be only two to three years.

Source link

Centrica David install Leisure Lloyd power push tailormade
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Rongke Power introduces 2 MW/8 MWh vanadium flow battery storage system – SPE

April 21, 2026

Jinko Power starts data center activities with 1 GW project in China – SPE

April 20, 2026

Pur Energy launches an all-in-one battery-based backup power solution for the home – SPE

April 18, 2026
Leave A Reply Cancel Reply

Don't Miss
Carbon Credit

Guyana Engages Airlines in Groundbreaking Carbon Credit Initiative – News Room Guyana

By solarenergyJune 30, 20240

Guyana Engages Airlines in Groundbreaking Carbon Credit Initiative…

Construction begins on massive solar project on roof of new JFK Airport terminal

September 24, 2024

Solar for all costs of a further 150 residential solar projects in DC

March 12, 2025

Silver price thrust sends PV -Makers to further reduce silver consumption

September 27, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Tesla launches three-phase Powerwall 3P – SPE

April 23, 2026

Why the UK solar industry needs to own its safety story

April 23, 2026

Fraunhofer ISE develops colored film technology for patterned solar panels

April 23, 2026

Thermoacoustic heat pumps are on the verge of commercial breakthrough – SPE

April 23, 2026
Our Picks

Tesla launches three-phase Powerwall 3P – SPE

April 23, 2026

Why the UK solar industry needs to own its safety story

April 23, 2026

Fraunhofer ISE develops colored film technology for patterned solar panels

April 23, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.