Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Tesla launches three-phase Powerwall 3P – SPE

April 23, 2026

Why the UK solar industry needs to own its safety story

April 23, 2026

Fraunhofer ISE develops colored film technology for patterned solar panels

April 23, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Thursday, April 23
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Energy Storage - The National Grid upgrade allows 100 MW BESS to connect to Solar Power Portal
Energy Storage

The National Grid upgrade allows 100 MW BESS to connect to Solar Power Portal

solarenergyBy solarenergyNovember 11, 2024No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email
The work includes extending the busbars, which allow the flow of power from the generation source to the power lines. Image: National Network.

National Grid has upgraded its Drax 132kV substation to enable the connection of TagEnergy’s 100MW/200MWh battery energy storage system (BESS).

According to the renewable energy developer, the North Yorkshire facility is the largest transmission-linked battery storage system in Britain. National Grid worked with contractor Omexom to safely facilitate the connection to the network.

The work includes extending the rails, which allow the flow of power from the generation source to the power lines, upgrading the rail protection and substation control systems, and installing an operational shutdown scheme.

The substation upgrades ensure network stability and security. The adjacent 400 kV substation houses the connection for the Drax power station, Britain’s largest biomass plant.

The BESS project is owned by TagEnergy and received support from technology supplier Tesla, optimiser Habitat Energy and independent sustainable energy company RES Group. In December 2021, TagEnergy acquired a 100% stake in RES’s Lakeside project in a deal worth £65 million.

Mark Brindley, Portfolio Director for the Northern Regions at National Grid Electricity Transmission, explains: “Our Drax substation was originally connected to a coal-fired power station in the 1970s and now plays an important role in the energy transition – by not only being the largest battery in the country, but also the largest biomass power plant.”

Franck Woitiez, CEO of TagEnergy, said: “We are proud to have delivered the project efficiently, energetically and connected to National Grid’s transmission network, without significant delays or operational issues. That is exactly what is needed to accelerate the transition.”

Grid connections that are crucial for clean energy

While there were no significant delays to the Lakeside BESS transmission link, the queue of projects waiting to be connected to the UK electricity grid is around 722 GW.

See also  EDPR NA acquires the Illinois Community Solar Portfolio from Renewable Properties

As reported by our sister site Current±, the British energy regulator Ofgem has made proposals for a system overhaul to speed up the connection process, which is widely recognized as a major barrier to net zero.

Infrastructural changes will also require an impetus. To support this, National Grid launched the ‘Great Grid Upgrade’ initiative in 2023. The aim is to build new infrastructure across England and Wales so that more clean energy can be transported from generation sites to where it is needed.

National Grid has committed to this investing £60 billion in network and grid upgrades over the next five years, on both sides of the Atlantic Ocean. By 2029, around £30 billion will be invested in Britain, while £28 billion will be invested in the US North East.

Source link

BESS connect grid national Portal power solar upgrade
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Why the UK solar industry needs to own its safety story

April 23, 2026

Fraunhofer ISE develops colored film technology for patterned solar panels

April 23, 2026

Thermoacoustic heat pumps are on the verge of commercial breakthrough – SPE

April 23, 2026
Leave A Reply Cancel Reply

Don't Miss
Energy Storage

decrease in the variability of wholesale prices – SPE

By solarenergyJune 22, 20240

Donato Leo is the author of a study on the relationship between solar photovoltaics, batteries…

Improving the performance of PV installations through an optimized charging ratio of the inverters – SPE

January 24, 2025

NexPracker acquires origami solar for $ 53 million – PV Magazine International

September 9, 2025

Illinois’ new energy law clarifies the rules for solar sites

November 25, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Tesla launches three-phase Powerwall 3P – SPE

April 23, 2026

Why the UK solar industry needs to own its safety story

April 23, 2026

Fraunhofer ISE develops colored film technology for patterned solar panels

April 23, 2026

Thermoacoustic heat pumps are on the verge of commercial breakthrough – SPE

April 23, 2026
Our Picks

Tesla launches three-phase Powerwall 3P – SPE

April 23, 2026

Why the UK solar industry needs to own its safety story

April 23, 2026

Fraunhofer ISE develops colored film technology for patterned solar panels

April 23, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.