Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Growth in solar and wind capacity slowed last year, analysis shows

March 6, 2026

Tigo introduces a 725 W optimizer for powerful solar panels

March 6, 2026

Fox ESS, SMA, SAX Power, Kostal and BYD impress with high efficiency – SPE

March 6, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Friday, March 6
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - News - EDF Renewables UK secures 800MW solar NSIP
News

EDF Renewables UK secures 800MW solar NSIP

solarenergyBy solarenergyJanuary 17, 2025No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email
The DCO application ensures a 27% reduction in the area that will be covered by solar panels. Image: EDF Renewables UK.

The National Planning Inspectorate has accepted EDF Renewables UK’s application for a development consent (DCO) for an 800 MW solar power plant.

The proposed Springwell Solar Farm, which will also have battery storage, would be located on land between Lincoln and Sleaford and cover 1,972 hectares across three different areas.

Due to its size, with a solar power generation capacity of 800 MW and a grid connection allowing the export and import of up to 800 MW to the grid, the development is classified as a Nationally Important Infrastructure Project (NSIP).

EDF Renewables has updated the plans after a second phase of public consultation took place last year. Changes to the plans include increased distance from nearby homes and updated plans for new planting and footpaths.

The DCO application ensures a 27% reduction in the area that will be covered by solar panels. It is now in the pre-exam stage, meaning anyone can register to sit the exam by submitting a written summary of their views between January 15 and February 17 this year.

According to EDF Renewables UK’s director of storage, solar and private wire Matthew Boulton: “Community input has been vital in helping us refine our plans for Springwell Solar Farm.”

The submission of the application comes after two rounds of consultation which showed residents were in favor of solar power stations such as Springwell. EDF found that 77% of people responding to a Survation survey conducted on behalf of EDF Renewables see climate change impacting their communities and 82% of people also said they support the development of solar farms.

See also  Zimbabwe looking for contractor for 5 MW of Solar - PV Magazine International

Given the typical timeline for a DCO application, now that the preliminary investigation (which typically lasts about three months) has begun, the project will likely enter the investigation phase in late April. If everything goes as quickly as possible, a decision could be made by the end of this year.

Lincolnshire is linked to several major solar projects, including the 350MW Mallard Pass Solar Farm which was granted a DCO last summer.

Fosse Green Energy Limited, a partnership between North East England-based developer Windel Energy and Canadian Solar subsidiary Recurrent Energy, launched the second public consultation for a solar and storage development to be located 9km south-west of Lincoln ; the scope of the project is yet to be confirmed, but the developers have announced they will apply for a DCO. The application is expected to be submitted in September 2025.

Source link

800MW EDF NSIP Renewables secures solar
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Growth in solar and wind capacity slowed last year, analysis shows

March 6, 2026

Tigo introduces a 725 W optimizer for powerful solar panels

March 6, 2026

Longi wins tender for 800 MW Hexi solar panels – SPE

March 6, 2026
Leave A Reply Cancel Reply

Don't Miss
Energy Storage

Why independent network companies are the key to the development of strategic schedule

By solarenergySeptember 11, 20250

Spencer Thompson, CEO of Eclipse Power, discusses the need for further competition in the transmission…

Chinese PV Industry Brief: GCL Technology Posts Sales Decline in 2023

May 4, 2024

‘Self-doubt has prevented many talented women to seize opportunities that they completely earn’ PV Magazine International

September 13, 2025

Primergy Powers Up 408-MW Ash Creek Solar Project in Texas

July 18, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Growth in solar and wind capacity slowed last year, analysis shows

March 6, 2026

Tigo introduces a 725 W optimizer for powerful solar panels

March 6, 2026

Fox ESS, SMA, SAX Power, Kostal and BYD impress with high efficiency – SPE

March 6, 2026

Longi wins tender for 800 MW Hexi solar panels – SPE

March 6, 2026
Our Picks

Growth in solar and wind capacity slowed last year, analysis shows

March 6, 2026

Tigo introduces a 725 W optimizer for powerful solar panels

March 6, 2026

Fox ESS, SMA, SAX Power, Kostal and BYD impress with high efficiency – SPE

March 6, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.