Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Vistra adds Enphase batteries to the Texas VPP program

March 6, 2026

ACME Solar signs 450 MW PPA in India, commissions new 38 MW/82 MWh BESS – SPE

March 6, 2026

Freight costs are rising due to military attacks in the Middle East

March 6, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Friday, March 6
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Technology - New model to optimize Desert PV Plant Cleaning schedule – PV Magazine International
Technology

New model to optimize Desert PV Plant Cleaning schedule – PV Magazine International

solarenergyBy solarenergySeptember 27, 2025No Comments4 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Scientists have used a CPLEX-based MIP model and tested it on part of the 10 MW Masdar City Solar Fotovoltaic plant. In their simulation, they assume the use of two robot -like cleaning agents to work on a horizon of 90 days. The total cleaning costs were estimated at $ 7,987.

September 26, 2025
Lior Kahana

A research team led by scientists from the University of Sharjah of the United Arab Emirates (VAE) has developed a new model to optimize the cleaning schedule of PV panels in power plants in deserts. They have demonstrated the technology using data from a 10 MW solar energy plant in Masdar City, located in the Emirate of Abu Dhabi.

“Our approach is intended to minimize both cleaning costs and financial losses due to power reduction as a result of pollution. The proposed method offers valuable insights for decision makers in the VAE, so that they can make informed decisions that are tailored to their specific priorities and limitations,” the scientists said. “Ultimately, this research wants to improve the performance of solar energy plants in the VAE and support the progress of sustainable and efficient energy systems.”

The new technology uses a commercial optimization solver (CPLEX)-based Mixed-Integer Programming (MIP) model. The CPLEX-based MIP model is fed with environmental data, including radiation, temperature and pollution speed; Operational data, such as parameters of the cleaning system; and economic factors, including cost data. The model comparisons are then used to calculate the energy output of the system, the loss speed and the cleaning restrictions. All this is done in view of the objective function of balancing energy loss costs against cleaning costs.

See also  Cyprus limits 29% of renewable energy in 2024 - PV Magazine International
The cleaning system

Image: Sustainable Futures, University of Sharjah, CC by 4.0

To demonstrate the model, the team took the full operational data of the Fotovoltaic factory of Masdar City from 2022. According to the collected points, the 10 MW park per year generates 17,564 MWH, from 87,780 PV modules. The facility area is 210,000 square meters, with 4,389 rows, each with 20-100 panels. The pollution rate is considered 0.02% to 0.9% per day and the energy rate is $ 0.1/kWh.

Their simulation was performed on a part of the park, consisting of 40 rows of 100 panels each. They assume that the use of two robot -like cleaning agents works over a horizon of 90 days, with cleaning intervals ranging from 3 to 20 days. The cleaning price was simulated at $ 0.012 per square meter or $ 0.05 per square meter. The optimization model was then used to calculate when and which rows of panels must be cleaned during the three months.

According to the results, the cleaning process is optimized by cleaning three rows a day. The number of cleaned solar panels per row during the 90 days varied from five to nine, with most rows being cleaned six or seven times. The cleaning costs amounted to $ 4,833 when taking a rate of $ 0.012 per square meter and amounted to $ 7,987 when the cleaning costs were $ 0.05 per square meter.

“By bridging quantitative optimization with practical considerations, the model offers a valuable decision -making support instrument for industry and policy makers,” the group concluded. “Restrictions include an optimality gap of 21.65%, dependence on its tropical pollution data without real-time variability and absence of empirical validation via tools such as PVsyst or SCADA systems.”

See also  Pexapark Records 24 European PPAs for more than 1.5 GW in March - PV Magazine International

Their work appeared in “Optimization of the cleaning plan of a solar PV system factory“Published in Sustainable future. Scientists from the University of Sharjah in the VAE, the University of Jean-MonTet in France and the University of Tunis El Manar in Tunisia participated in the study.

This content is protected by copyright and may not be reused. If you want to work with us and reuse part of our content, please contact: editors@pv-magazine.com.

Popular content

Source link

cleaning desert International magazine model optimize plant schedule
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Prices for TOPCon modules in China are higher now that March shipments are clear – SPE

March 6, 2026

A deep learning model tracks the status of the EV battery with high precision

March 6, 2026

Mitsubishi Electric Trane announces new heat pump line for hydronic heating – SPE

March 6, 2026
Leave A Reply Cancel Reply

Don't Miss
Policy

US imposes anti-dumping duties on Southeast Asian solar cells – SPE

By solarenergyDecember 2, 20240

U.S. trade officials announced preliminary affirmative decisions on anti-dumping duties on imports of crystalline solar…

Clean Power Hydrogen launches membraneless electrolyzers – SPE

May 30, 2024

Fidra Energy reaches financial closure of the largest Bess in the UK

September 10, 2025

Kansas Army Base now powered by 16-MW Zonneportfolio

February 24, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Vistra adds Enphase batteries to the Texas VPP program

March 6, 2026

ACME Solar signs 450 MW PPA in India, commissions new 38 MW/82 MWh BESS – SPE

March 6, 2026

Freight costs are rising due to military attacks in the Middle East

March 6, 2026

Solis launches new portfolio of residential storage systems – SPE

March 6, 2026
Our Picks

Vistra adds Enphase batteries to the Texas VPP program

March 6, 2026

ACME Solar signs 450 MW PPA in India, commissions new 38 MW/82 MWh BESS – SPE

March 6, 2026

Freight costs are rising due to military attacks in the Middle East

March 6, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.