Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Monday, June 8
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Energy Storage - Ofgem supports a fine for slow-moving projects in the queue
Energy Storage

Ofgem supports a fine for slow-moving projects in the queue

solarenergyBy solarenergyOctober 21, 2025No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Developers have until November 3 to respond to Ofgem’s ‘minded’ position to approve a Progression Commitment Fee (PCF) as part of the reformed grid connection process.

The plans that Ofgem wants to approve will see projects that accept a Gate 2 offer but fail to meet Queue Management Milestone 1, namely initiating planning permission, pay the PCF. Treated as a cancellation fee, the PCF would start at £2,500/MW and increase by £2,500/MW for every six months that a project does not progress, up to a maximum of £10,000/MW.

The National Energy System Operator (NESO) has proposed an amendment to the Connection and Use of System Code (CUSC). introduces the PCF in February as part of being grid connection queuing reforms.

It would be a way to ensure that the grid queue keeps moving after the reforms are implemented. Projects are required to provide protection against the PCF until they reach M1.

The regulator’s main reasons for approving the change to the code are that it will improve queuing efficiency by encouraging timely termination of less committed projects, ‘strengthen’ competition in electricity generation and supply and ultimately ‘ensure a ‘healthy’, efficient and competitive connection queue that is in line with the objectives of CP2030.

However, it’s not a move that many are likely to be happy with. Earlier this year, when Ofgem approved NESO’s grid connection queue review, many developers said they felt the decision was hasty and would disadvantage some projects. creating “winners and losers”.

Related:Lime Down Solar’s 500MW/1GWh solar-plus-storage DCO accepted by PINS

While some solar developers were cautiously supportive of the reforms, much of that goodwill has disappeared as the process has gotten underway. First the application portal for Gate 2 connections experienced “many usability issues”keeping the window open longer and granting a reprieve when projects would receive connection offers.

See also  RIC Energy sells solar energy projects in the New York community

The timeline for Gate 2 offerings has been pushed since then, now with developers to find out in December whether they have a connection.

As Solar Media’s Market Research solar analyst Josh Cornes wrote in a blog post Solar energy portalhave transmission-scale solar PV developers taken enormous risks over the past five yearswith millions being spent to secure grid connection offers for solar projects.

If developers wait until the announcement date for their network offerings, anyone who gets connections before 2029 simply won’t have enough time to go through the prerequisites process and construction to meet the commercial operation date (COD) that NESO assigns them.

The additional pressure of the PCF adds a new layer to this financial risk. However, it is worth noting that when NESO submitted the code change proposal, director of its liaison program Matt Vickers wrote that the additional requirement will only be triggered if projects in the early stages of the Gate 2 queue do not progress as expected “and if there are still too many non-viable projects that hinder the progress of others without being replaced by suitable alternatives.”

Related:Beyond the panels: how solar farms drive net benefits for biodiversity

If a ‘trigger point’ is not reached, the PCF may never activate. Consultation documents and form to respond available from Ofgem here.



Source link

Fine ofgem projects queue slowmoving supports
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

UK government considers community grant for battery storage

June 5, 2026

UK CfD scheme provides optimism for the UK investment landscape

June 5, 2026

Nova commissions a 400kW floating solar project in Cheshire

June 4, 2026
Leave A Reply Cancel Reply

Don't Miss
News

UK has ‘stable policy outlook’ ahead of election

By solarenergyJune 4, 20240

Finlay Colville speaking at the UK Solar Summit in London this morning. Image: Solar Power…

400MWh BESS approved for construction near Carlisle

July 18, 2024

PV, storage to anchor Ireland’s first co-located data center campus – SPE

March 30, 2026

Acenergy Signs 3 GWH Battery Supply Deal with CATL – PV Magazine International

August 25, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026

‘Come out from behind your screen, our industry is ultimately about people’

June 6, 2026
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.