Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Monday, June 8
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - News - NeoVolta partners with PotisEdge and Longi to create BESS in Georgia
News

NeoVolta partners with PotisEdge and Longi to create BESS in Georgia

solarenergyBy solarenergyJanuary 20, 2026No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Supplier of lithium batteries NeoVolta announced it would begin manufacturing battery energy storage systems (BESS) in Pendergrass, Georgia. Through a joint venture with Longi and recently ESS acquisition PotisEdge“NeoVolta Power” will start mass production in the 2 GWh power plant in mid-2026. The site is scalable up to 8 GWh.

PotisEdge BESS

The facility will initially focus on prismatic battery pack assembly and DC container integration, supporting approximately 89 production personnel at stable initial capacity. While NeoVolta has traditionally focused on the residential market, the Georgian-made BESS will be designed for the utility and commercial markets.

“This transformative joint venture with PotisEdge and Longi represents a major step forward for NeoVolta and positions us as a vertically integrated leader in the fast-growing energy storage sector. By launching domestic BESS production, we are directly addressing rising demand in the utility and C&I markets, enabling scalable, reliable solutions for grid stability, peak load management and high-growth applications,” said Ardes Johnson, CEO of NeoVolta.

NeoVolta has a 60% controlling interest in the NeoVolta Power joint venture and will oversee product strategy, commercialization and customer engagement. The governance is structured by a five-member board of managers, three of whom are appointed by NeoVolta. PotisEdge has a 20% ownership interest and brings deep expertise in large-scale BESS manufacturing, equipment installation, commissioning and support on production platforms. The remaining 20% ​​is owned by a group of strategic investors who provide additional technical and operational support.

The joint venture brings together three complementary energy technology leaders: NeoVolta, PotisEdge and Longi Green Energy.

Longi is the majority shareholder of PotisEdge as part of its strategic expansion into energy storage. Longi’s involvement reflects a broader industry convergence in solar, storage and integrated clean energy solutions. Together, the three companies combine NeoVolta’s US market presence and product strategy, PotisEdge’s BESS manufacturing systems and LONGi’s global scale and execution discipline.

See also  Surprisingly diverse innovations led to more dramatic cheaper solar panels

“PotisEdge is proud to partner with NeoVolta as we build a U.S. battery manufacturing platform designed for scale and long-term growth,” said Minjie She, Founder and CTO of PotisEdge. “As a minority owner, we contribute our manufacturing experience, systems and technical capabilities to support efficient execution and a successful manufacturing platform for utility-scale energy storage solutions and C&I.”

“Longi’s strategic expansion into energy storage reflects our commitment to delivering integrated, scalable clean energy solutions,” said Eric Luo, group vice chairman and president of North America at Longi Green Energy. “By aligning PotisEdge’s technology leadership with NeoVolta’s U.S. market expertise, this joint venture brings together complementary strengths to serve the next phase of growth in renewable energy infrastructure.”

Source link

BESS create Georgia Longi NeoVolta partners PotisEdge
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Fidra Energy buys 1GW BESS from Innova

June 4, 2026

Eelpower Energy acquires a 50MW/100MWh BESS project in Devon

May 28, 2026

Saudi Arabia gets first BESS production facility – SPE

May 27, 2026
Leave A Reply Cancel Reply

Don't Miss
Energy Storage

Aura Power secures financing for 49.9 MWp Staffordshire PV project

By solarenergyJune 4, 20260

British solar developer Aura Power has secured project financing for its Preston Hill Solar Farm…

The AD/CVD moratorium on solar imports from Southeast Asia expires today – does it even matter?

June 6, 2024

Construction begins on 1.1 GW solar project in Tibet – SPE

September 11, 2024

New hail test is intended to more accurately measure the resilience of the solar panel

September 4, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026

‘Come out from behind your screen, our industry is ultimately about people’

June 6, 2026
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.