Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Fraunhofer ISE develops colored film technology for patterned solar panels

April 23, 2026

Thermoacoustic heat pumps are on the verge of commercial breakthrough – SPE

April 23, 2026

The federal court has halted Trump administration orders that hinder solar and wind energy development

April 23, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Thursday, April 23
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Technology - Test error on a 100 MW battery disrupts the power connection between Estonia and Finland – SPE
Technology

Test error on a 100 MW battery disrupts the power connection between Estonia and Finland – SPE

solarenergyBy solarenergyJanuary 30, 2026No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

During tests at the 100 MW Kiisa battery farm in Estonia, both EstLink 1 and EstLink 2 tripped, causing the most serious disruption to the regional electricity grid since desynchronization with the Russian electricity system. As a result, almost 1 GW of capacity was lost within seconds. The owner of the park has now publicly pointed out the battery manufacturer.

January 29, 2026
Marija Maisch

By ESS news

An outage in Estonia’s electricity system on January 20 caused both EstLink interconnections between Estonia and Finland to go offline, cutting around 1,000 MW of capacity, equivalent to around 20% of the Baltic region’s winter electricity needs.

The shortfall was initially covered by support from the continental European electricity grid, as the 500 MW AC link between Poland and Lithuania operated at double its rated capacity to compensate. Later, reserve capacity was deployed within the Baltic states.

The oscillations were caused by a 100 MW/200 MWh battery energy storage system in Kiisa, just south of Tallinn, one of the largest battery storage systems in the Baltics. The incident occurred during the final tests of the grid connection, causing the DC cables to trip.

The €100 million facility, developed by Estonian company Evecon in collaboration with French companies Corsica Sole and Mirova, features 54 battery containers supplied by Nidec Conversion.

To read further, visit our ESS news website.

This content is copyrighted and may not be reused. If you would like to collaborate with us and reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

See also  'Garbage in, garbage out' – solar industry debates the reality of AI – SPE

Source link

battery connection disrupts error Estonia Finland power SPE test
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Thermoacoustic heat pumps are on the verge of commercial breakthrough – SPE

April 23, 2026

Zendure launches battery ranges for residential PV – SPE

April 23, 2026

Solar energy’s rebound effect could increase European electricity demand by 5% by 2050 – SPE

April 23, 2026
Leave A Reply Cancel Reply

Don't Miss
Policy

Battery storage advances in Massachusetts as barriers fall

By solarenergyMarch 24, 20260

The development and construction of battery energy storage systems (BESS) in Massachusetts has become more…

New approach to measure Perovskiet-Silicon Tandem PV module performance via LED-based solar simulators

August 22, 2025

The solar industry remains skeptical about reforms of Neso’s grid connections

February 13, 2025

Energize adventure with solar energy

October 30, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Fraunhofer ISE develops colored film technology for patterned solar panels

April 23, 2026

Thermoacoustic heat pumps are on the verge of commercial breakthrough – SPE

April 23, 2026

The federal court has halted Trump administration orders that hinder solar and wind energy development

April 23, 2026

Zendure launches battery ranges for residential PV – SPE

April 23, 2026
Our Picks

Fraunhofer ISE develops colored film technology for patterned solar panels

April 23, 2026

Thermoacoustic heat pumps are on the verge of commercial breakthrough – SPE

April 23, 2026

The federal court has halted Trump administration orders that hinder solar and wind energy development

April 23, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.