Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Ireland’s RESS 6 solar and wind auction includes NZIA criteria

July 28, 2026

Idaho utility-scale projects see two major milestones | Projects Weekly

July 27, 2026

Croatia’s first energy community starts sharing solar energy

July 27, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Tuesday, July 28
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Energy Storage - Ireland’s RESS 6 solar and wind auction includes NZIA criteria
Energy Storage

Ireland’s RESS 6 solar and wind auction includes NZIA criteria

solarenergyBy solarenergyJuly 28, 2026No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

The Government of the Republic of Ireland has published the terms for its annual Renewable Electricity Support Scheme (RESS 6) auction, introducing separate onshore wind and solar pools for the first time and using non-price EU Net-Zero Industry Act (NZIA) criteria.

The terms and conditions provide greater certainty for property developers preparing to participate in the auction, trade body Solar Ireland said in a message last week. The government published the conditions of the auction the week before, on July 16.

The qualifying period runs from (all dates in 2026) July 30 to August 27, with final qualification decisions on October 21, followed by the auction entry period from October 29 to November 5. The preliminary auction results will be announced on November 18, followed by the final results on December 2. The award announcements are on December 10.

The exact target quantity will be released closer to auction time. It is operated by transmission system operator Eirgrid.

Related:Schroders Greencoat, Statkraft updates on UK solar power stations

It is the first RESS auction to include separate technology pots for onshore solar and wind energy. In previous years it was one pot, although each technology had its own strike price.

Last year’s auction purchased 218.84 MW of onshore wind energy and 860.38 MW of solar energya total of 1.08 GW spread over 23 projects.

It is also the first RESS auction to include non-price criteria under the Net-Zero Industry Act (NZIA). The NZIA is an EU law that aims to stimulate the deployment of clean energy and upstream production. passed in 2024 (covered by our sister site PV technology at the time).

See also  TSEC unveils typhoon-resistant glass-glass solar panels – SPE

Within each pot, projects are scored on 85% price, 5% resilience and 10% energy system integration.

The energy system integration score allocates a maximum of 2.5% for secondary technology integration and 7.5% for battery storage integration. As more and more renewable energy sources come online, projects that can provide dispatchability and flexibility with storage are becoming increasingly valuable.

However, Solar Ireland said significant regulatory and market barriers remain.

“Current rules continue to limit the efficient deployment of hybrid and co-located projects, meaning developers are incentivized through RESS to deliver capabilities that the broader regulatory framework does not yet fully support,” the trade body said.

Meanwhile, the provisions for the solar capacity factor and unrealized available energy compensation remain unchanged from previous auctions.

The solar capacity factor of 11% is an assumption of how much power solar PV will actually generate compared to the theoretical maximum. The Unrealized Available Energy Compensation, meanwhile, is a financial mechanism that compensates producers for physical availability that cannot be delivered due to grid, curtailment or other system issues beyond their control.

Related:Elgin and Erova sign 15-year PPA for 112.6 MW UK solar PV portfolio

View all details about RESS 6 on the Irish government website here.



Source link

auction criteria includes Irelands NZIA RESS solar wind
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Croatia’s first energy community starts sharing solar energy

July 27, 2026

The government sets targets for 5GW T-1 and 40.9GW T-4

July 27, 2026

Chinese PV Industry Briefing: First-half solar additions total only 72 GW

July 26, 2026
Leave A Reply Cancel Reply

Don't Miss
Technology

New design strategy for PV systems avoids oversizing and curtailment – ​​SPE

By solarenergyMay 15, 20240

A group of scientists in Thailand have outlined a new approach to preventing oversizing and…

Haven Energy that offers batteries funded by SGIP to 300 Clean Energy Alliance Solar HomeWers

June 23, 2025

The US will investigate solar cells from Ethiopia for possible tariff evasion

July 17, 2026

France deploys 1.05 GW of PV in the second quarter – SPE

September 3, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Ireland’s RESS 6 solar and wind auction includes NZIA criteria

July 28, 2026

Idaho utility-scale projects see two major milestones | Projects Weekly

July 27, 2026

Croatia’s first energy community starts sharing solar energy

July 27, 2026

The government sets targets for 5GW T-1 and 40.9GW T-4

July 27, 2026
Our Picks

Ireland’s RESS 6 solar and wind auction includes NZIA criteria

July 28, 2026

Idaho utility-scale projects see two major milestones | Projects Weekly

July 27, 2026

Croatia’s first energy community starts sharing solar energy

July 27, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.