Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

A deep learning model tracks the status of the EV battery with high precision

March 6, 2026

Mitsubishi Electric Trane announces new heat pump line for hydronic heating – SPE

March 6, 2026

Origis is developing a 413 MW solar portfolio in West Texas

March 6, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Friday, March 6
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Energy Storage - The new capacity market auction in Poland could hamper the deployment of storage – SPE
Energy Storage

The new capacity market auction in Poland could hamper the deployment of storage – SPE

solarenergyBy solarenergyJune 3, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

The design parameters for this year’s capacity market auction in Poland could make the rollout of battery energy storage systems (BESS) much more difficult. The paper proposes a significant reduction in the BESS derating factor, which could be especially damaging for longer-lived storage systems.

June 3, 2024 Marija Maisch

Image: UniEnergy Technologies, Wikimedia Commons

From pv magazine ESS news place

Poland’s battery revolution is in the starting blocks, but a newly proposed regulation could prevent it from reaching its full potential.

Earlier this week, a draft regulation was published setting out the parameters for this year’s procurement round (here: https://lnkd.in/eGhde6ft). One of its key components was a proposed reduction in the BESS derating factor from 95% to 57.6%.

A derating factor is a multiplication factor applied to a unit’s actual generation capacity to determine the maximum contract size it can win in the capacity market auction. It is based on the expected availability of interruptible capacity in hours when demand is greatest.

For example, with the new derating factor of 57%, a 100 MW battery could win a contract for a capacity of 57 MW. Investors would typically contract even less to ensure they can meet their capacity obligation.

“Derating factors don’t necessarily have to be duration-specific,” says Grzegorz Walkowski, senior associate at Aurora Energy Research. pv magazine Energy storage. “In the Polish market, units are expected to produce their contracted capacity for four hours, requiring investors to adjust their strategy based on their storage duration and repowering plans. This is generally positive as it allows the market to determine the most effective approach.”

See also  100 MW Hertz 1 battery comes into use after grid incident between Estonia and Finland - SPE

To read further, visit our ESS news website.

This content is copyrighted and may not be reused. If you would like to collaborate with us and reuse some of our content, please contact: editors@pv-magazine.com.

Source link

auction capacity deployment hamper Market Poland SPE storage
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Mitsubishi Electric Trane announces new heat pump line for hydronic heating – SPE

March 6, 2026

Oleic acid anti-pollution coating for solar panels – SPE

March 5, 2026

The technical interface makes perovskite solar cells ready for the market

March 5, 2026
Leave A Reply Cancel Reply

Don't Miss
Policy

Eswatini organizes mini-grid tender on solar energy and batteries – SPE

By solarenergyOctober 29, 20250

The Eswatini Energy Regulatory Authority is looking for a project developer to build a solar…

Puerto Rico’s community possession of solar energy: alternative to frequent blackouts

July 26, 2025

Canadian Solar wins US patent case against Maxeon

January 16, 2026

Carrier introduces residential R32 air-to-water heat pump-PV Magazine International

March 10, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

A deep learning model tracks the status of the EV battery with high precision

March 6, 2026

Mitsubishi Electric Trane announces new heat pump line for hydronic heating – SPE

March 6, 2026

Origis is developing a 413 MW solar portfolio in West Texas

March 6, 2026

New Jersey expands state community solar program by 3 GW

March 6, 2026
Our Picks

A deep learning model tracks the status of the EV battery with high precision

March 6, 2026

Mitsubishi Electric Trane announces new heat pump line for hydronic heating – SPE

March 6, 2026

Origis is developing a 413 MW solar portfolio in West Texas

March 6, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.