Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Sol Systems adds to project portfolio with Texas acquisition | Projects Weekly

August 31, 2026

Climate-Linked Supply Chain Risk Is Already In Your P&L

August 26, 2026

Drake Plastics gets new carport project near Houston | Projects Weekly

August 17, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Sunday, September 6
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Technology - BASF and NGK launch sodium-sulfur battery with a degradation rate of less than 1% – SPE
Technology

BASF and NGK launch sodium-sulfur battery with a degradation rate of less than 1% – SPE

solarenergyBy solarenergyJune 12, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

A series of technological improvements incorporated into the new product NAS MODEL L24 ensure lower maintenance costs compared to the previous type of sodium sulfur battery developed by the two manufacturers.

June 12, 2024 Marija Maisch

From pv magazine ESS news place

BASF Stationary Energy Storage, a subsidiary of chemical company BASF, and Japanese ceramics manufacturer NGK Insulators have launched a new version of their sodium sulfur batteries (NAS).

The containerized NAS Model L24 battery, jointly developed by the partners, whose collaboration began in 2019, features a number of technological improvements. Compared to the previously available battery type, the new NAS battery features a significantly lower degradation rate of less than 1% per year due to reduced corrosion in battery cells.

Another technical achievement is an improved thermal management system in battery modules, which allows longer continuous discharge. For example, in the case of discharging with 200 kW-dc per NAS Model L24 unit, the continuous discharge duration is six hours.

The new technology elements are incorporated into the field-proven battery design. NAS batteries were implemented virtually for the first time in the world by NGK and have since been installed at more than 250 locations worldwide, with a total capacity of more than 720 MW and a total installed capacity of approximately 5 GWh.

Like the previous version, the new concept complies with the latest safety standards for energy storage installations, such as UL1973 and UL9540A.

To read further, visit our new ESS news website.

This content is copyrighted and may not be reused. If you would like to collaborate with us and reuse some of our content, please contact: editors@pv-magazine.com.

See also  Solar energy on canals reduces water evaporation by 70% and algae growth by 85% – SPE

Source link

BASF battery degradation launch NGK Rate sodiumsulfur SPE
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Georgia Power cuts the ribbon on the Moody Battery Facility

July 29, 2026

Financial close of Fidra Energy’s 500MW battery energy storage

July 20, 2026

Battery storage developers win 81% of planning applications in England

July 17, 2026
Leave A Reply Cancel Reply

Don't Miss
News

EDP ​​​​Renewables completes a 175 MW solar project in Arkansas

By solarenergyMay 30, 20240

EDP ​​Renewables North America has announced the completion of the new Crooked Lake Solar Park…

Webasto unveils a vehicle-integrated PV system that covers the rear window and roof

September 14, 2024

China orders world’s largest 1 GW open sea offshore solar project – SPE

December 29, 2025

Solar for all costs of a further 150 residential solar projects in DC

March 12, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Sol Systems adds to project portfolio with Texas acquisition | Projects Weekly

August 31, 2026

Climate-Linked Supply Chain Risk Is Already In Your P&L

August 26, 2026

Drake Plastics gets new carport project near Houston | Projects Weekly

August 17, 2026

What Counts For Scope 3 Targets

August 12, 2026
Our Picks

Sol Systems adds to project portfolio with Texas acquisition | Projects Weekly

August 31, 2026

Climate-Linked Supply Chain Risk Is Already In Your P&L

August 26, 2026

Drake Plastics gets new carport project near Houston | Projects Weekly

August 17, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.