Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Sol Systems adds to project portfolio with Texas acquisition | Projects Weekly

August 31, 2026

Climate-Linked Supply Chain Risk Is Already In Your P&L

August 26, 2026

Drake Plastics gets new carport project near Houston | Projects Weekly

August 17, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Sunday, September 6
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Energy Storage - Uniper to recommission a 160 MW pumped storage facility in Germany – SPE
Energy Storage

Uniper to recommission a 160 MW pumped storage facility in Germany – SPE

solarenergyBy solarenergyJune 27, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

The Happurg pumped storage facility was closed in 2011 for safety reasons after the bottom of the upper reservoir was damaged. Uniper has carried out feasibility studies at the site, with the intention of reconnecting it to the electricity grid in 2028. The facility can store approximately 850 MWh of electricity in the form of pumped water.

June 27, 2024 Blathnaid O’Dea

From pv magazine ESS news place

Uniper has said it will invest around €250 million ($267 million) to recommission a pumped storage facility in Happurg, a city in Bavaria, southeastern Germany. The Düsseldorf-based utility multinational plans to reconnect the facility to the electricity grid in 2028.

Largest pumped storage facility in Bavaria

The Happurg plant is one of the largest pumped storage facilities in Germany and the largest in Bavaria. With a capacity of 160 MW, it has a drop height of 209 meters and can store approximately 850 MWh of electricity. It was shut down in 2011 for safety reasons after the bottom of the upper reservoir was damaged.

But hopes of returning the plant to service have not been completely abandoned and the facility has been subject to intensive underground investigation and geotechnical assessments. A feasibility study has been carried out and approved by the relevant authorities. The study outlined a technical concept for the rehabilitation of the upper basin, which would allow the project to be restarted.

Popular content

Visit our website to read more ESS news website.

This content is copyrighted and may not be reused. If you would like to collaborate with us and reuse some of our content, please contact: editors@pv-magazine.com.

See also  Australia to host a 6 GWh CATL battery in a gas-plus-storage hybrid together with Quinbrook – SPE

Source link

facility Germany pumped recommission SPE storage Uniper
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Georgia Power cuts the ribbon on the Moody Battery Facility

July 29, 2026

Ireland’s RESS 6 solar and wind auction includes NZIA criteria

July 28, 2026

The government sets targets for 5GW T-1 and 40.9GW T-4

July 27, 2026
Leave A Reply Cancel Reply

Don't Miss
Carbon Credit

Green transition at risk as carbon offset programs falter

By solarenergyMay 9, 20240

Companies around the world are increasingly choosing to use carbon credit schemes to offset their…

Treasury Department Announces Final Rules for Low-Income IRA Bonus Loans

January 8, 2025

Great British Energy’s five-year plan strengthens its role

December 5, 2025

AGL works with Elecsome on recycling plan for solar panels – SPE

June 26, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Sol Systems adds to project portfolio with Texas acquisition | Projects Weekly

August 31, 2026

Climate-Linked Supply Chain Risk Is Already In Your P&L

August 26, 2026

Drake Plastics gets new carport project near Houston | Projects Weekly

August 17, 2026

What Counts For Scope 3 Targets

August 12, 2026
Our Picks

Sol Systems adds to project portfolio with Texas acquisition | Projects Weekly

August 31, 2026

Climate-Linked Supply Chain Risk Is Already In Your P&L

August 26, 2026

Drake Plastics gets new carport project near Houston | Projects Weekly

August 17, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.