Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Sol Systems adds to project portfolio with Texas acquisition | Projects Weekly

August 31, 2026

Climate-Linked Supply Chain Risk Is Already In Your P&L

August 26, 2026

Drake Plastics gets new carport project near Houston | Projects Weekly

August 17, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Sunday, September 6
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - News - Astrobotic’s VOLT rover passes key tests on the moon’s surface
News

Astrobotic’s VOLT rover passes key tests on the moon’s surface

solarenergyBy solarenergyJuly 23, 2024No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Astrobotic’s VOLT rover passes key tests on the moon’s surface






Astrobotic has further ramped up its efforts to create a power grid on the moon by launching a summer-long test campaign for its VSAT Optimized for Lunar Traverse (VOLT). Designed to traverse the lunar surface, the VOLT rover features a vertical solar panel to harness solar energy to charge various lunar resources such as habitats, rovers and scientific instruments, especially at the moon’s south pole.

The VOLT engineering model mobile base underwent rigorous testing at the Simulated Lunar Operations Laboratory (SLOPE) at NASA’s Glenn Research Center in Cleveland. These tests assessed the rover’s stability, gimbal functionality, and sun tracking on a simulated lunar regolith slope. Although designed for slopes of 15 degrees, the rover exceeded expectations by maintaining stability on a 20-degree slope without skidding.

VOLT’s gimbal maintained a horizontal position within a tolerance of 3 degrees, proving it can support the 18-meter-high vertical solar panels that will be integrated later this year. NASA Glenn’s motion capture cameras confirmed the rover’s stability on a regolith surface, ensuring its ability to navigate the expected terrain of the moon’s south pole.

“To provide continuous power to the moon’s poles, we need to take advantage of existing peaks of persistent light: locations with near-constant sunlight throughout the year. Because most of these locations are on crater rims with high slope angles, we designed VOLT to be deployed on extreme slopes. These tests have proven that our system can work successfully, with sufficient margin for more extreme locations,” said Robert Rolley, Astrobotic principal investigator for VOLT.

See also  Stäubli will expand production capacity for solar energy components in the US

Before the test campaign, the Astrobotic team developed, prototyped and assembled the mobile base of the VOLT, a rover with a chassis the size of a minivan. Assembly, including electronics and gimbal system, was completed within 12 weeks. The gimbal is crucial for orienting the solar panel to collect sunlight, leveling it on uneven terrain, and maintaining stability as it autonomously tracks the sun in 360 degrees. The VOLT can be delivered to the moon on Astrobotic’s lunar lander Griffin and operate independently without the need to be towed.

VOLT is an integral part of Astrobotic’s LunaGrid system, designed to provide power to the moon. LunaGrid is a network of tethered VOLTs that generate and distribute power via wired connections and wireless chargers on board tethered CubeRovers, which act as mobile plugs. This system aims to support lunar systems during the day and ensure their survival during the lunar night.

“It is imperative that we solve the lunar power generation challenge for sustainable long-term operations,” said John Landreneau, Senior Project Manager at Astrobotic. “VOLT’s ability to precisely drive and operate in the most desirable areas for solar energy capture and distribution sets this technology apart. With strategic partnerships and new technology developed in-house by our team, VOLT and the LunaGrid system are making great strides to deliver reliable energy to lunar surface systems such as landers, rovers, habitats and science suites.”

The full VOLT engineering model will be unveiled in late October at the Keystone Space Conference in Pittsburgh, PA. Astrobotic aims to deploy and demonstrate LunaGrid elements on the lunar surface by mid-2026, with the first operational LunaGrid expected at the moon’s south pole by 2028.

See also  New home battery from Kora comes with Smart Panel and VPP platform



Source link

Astrobotics key moons passes rover surface tests volt
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Pennsylvania passes law establishing solar decommissioning plans

July 21, 2026

The Hydrogen Stream: Wärtsilä tests 100% hydrogen engine

June 13, 2026

Road tests show a strong impact of shade on vehicle-integrated solar photovoltaics

May 26, 2026
Leave A Reply Cancel Reply

Don't Miss
Energy Storage

Battery Units Arrive for Statkraft’s 200MW Thornton BESS-Solar Power Portal

By solarenergyNovember 27, 20240

A total of 620 battery units have arrived at Thornton Greener Grid Park, located in…

Fullmark Energy Completes $46 Million ITC Transfer for Energy Storage Portfolio

November 19, 2025

Zirconium-doped indium oxide electrodes for heterojunction solar cells

June 13, 2024

More TOPCon patent infringement complaints filed in the United States

October 22, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Sol Systems adds to project portfolio with Texas acquisition | Projects Weekly

August 31, 2026

Climate-Linked Supply Chain Risk Is Already In Your P&L

August 26, 2026

Drake Plastics gets new carport project near Houston | Projects Weekly

August 17, 2026

What Counts For Scope 3 Targets

August 12, 2026
Our Picks

Sol Systems adds to project portfolio with Texas acquisition | Projects Weekly

August 31, 2026

Climate-Linked Supply Chain Risk Is Already In Your P&L

August 26, 2026

Drake Plastics gets new carport project near Houston | Projects Weekly

August 17, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.