Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Vistra adds Enphase batteries to the Texas VPP program

March 6, 2026

ACME Solar signs 450 MW PPA in India, commissions new 38 MW/82 MWh BESS – SPE

March 6, 2026

Freight costs are rising due to military attacks in the Middle East

March 6, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Friday, March 6
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Energy Storage - 49.9 MW BESS approved near Kintore despite public objections
Energy Storage

49.9 MW BESS approved near Kintore despite public objections

solarenergyBy solarenergyAugust 30, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email
A planning map of the Kintore project. Image: Scala Renewables Group.

Despite public objections, planning permission has been granted for a battery energy storage system (BESS) near Kintore in Scotland.

XRE Gamma and Scala Renewables Group were granted development consent for the 49.9 MW development, which will consist of 36 batteries, 18 battery integration units and associated works to connect these to a local substation.

The proposals were met with significant opposition, with Aberdeenshire Council receiving 51 letters of objection from the local community. Many residents were concerned about the potential impact on wildlife and the ability of local emergency services to respond to a possible fire or chemical leak. Kintore and the District Community Council also expressed fears over fire safety, as well as drainage and flooding.

Things were delayed when Scottish and Southern Electricity Networks (SSEN) asked Transmission to amend landscaping plans to prevent damage to the 132kV overhead line, which runs across the site.

According to local reporting from the Press & Journal, Representatives of developer XRE Gamma and agent Scala Renewables were able to allay the council members’ concerns. They confirmed that XRE Gamma was aware of locals’ concerns about fire risk and pledged to provide local firefighters with additional training and equipment to tackle any potential fire. can take place on site. This includes drawing up a detailed fire safety plan in collaboration with the local fire brigade.

Meanwhile, Sharon Queeney of Scala Renewables noted that the project could strengthen the region’s green credentials, stating: “By endorsing this project, Aberdeenshire can demonstrate its commitment to creating a robust, low-carbon, safe and flexible system. ”

See also  Tarief uncertainty seizes the development of the American battery - PV Magazine International

This isn’t the only recent development to face a backlash from the community, with some others having their planning permission refused.

Proposals for a 30MW solar farm just outside Salisbury, Wiltshire, were recently rejected by Wiltshire Council due to concerns over the lack of grid connection detail in project plans, which one councilor called ‘crazy’.

Environmental concerns surrounding the nearby River Ebbe and the location of 50% of the project on the best and most versatile agricultural land were also cited as reasons for the rejection.

Source link

approved BESS Kintore objections public
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

ACME Solar signs 450 MW PPA in India, commissions new 38 MW/82 MWh BESS – SPE

March 6, 2026

Solis launches new portfolio of residential storage systems – SPE

March 6, 2026

EirGrid identifies a shortage of energy capacity in Ireland

March 5, 2026
Leave A Reply Cancel Reply

Don't Miss
Solar Industry

Sound barrier integrated solar photovoltaic for highways, railways

By solarenergyJune 21, 20240

A German research team is testing new module concepts in practice that can be integrated…

Longi launches an all-black return contact Solar Panel series

May 10, 2025

Floating solar project overlooks skiing capital of Utah

January 15, 2025

A non-flammable battery for a safer, carbon-free future

November 23, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Vistra adds Enphase batteries to the Texas VPP program

March 6, 2026

ACME Solar signs 450 MW PPA in India, commissions new 38 MW/82 MWh BESS – SPE

March 6, 2026

Freight costs are rising due to military attacks in the Middle East

March 6, 2026

Solis launches new portfolio of residential storage systems – SPE

March 6, 2026
Our Picks

Vistra adds Enphase batteries to the Texas VPP program

March 6, 2026

ACME Solar signs 450 MW PPA in India, commissions new 38 MW/82 MWh BESS – SPE

March 6, 2026

Freight costs are rising due to military attacks in the Middle East

March 6, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.