Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Sunday, June 7
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Energy Storage - Cleve Hill successfully appealed against Swale Council’s refusal of BESS
Energy Storage

Cleve Hill successfully appealed against Swale Council’s refusal of BESS

solarenergyBy solarenergyJuly 13, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email
An aerial view of the Cleve Hill Solar Park site. Image: Quinbrook.

The developer of Cleve Hill Solar Park, a 373MW solar farm, has successfully appealed Swale Council’s decision to refuse permission for the co-located 150MW battery energy storage system (BESS).

Earlier this year, Solar energy portalreported that a Swale Borough Council local planning committee refused an application to install the BESS asset on the development, formally known as Project Fortress.

Residents were afraid of using lithium ferrophosphate batteries (LFP) to store energy because they are “more subject to explosion risk than other types”, according to a BBC report.

One of the main reasons for the initial rejection of the safety management plan was a “lack of on-site water storage facilities, a lack of access to the battery storage area and the absence of an evacuation plan.”

But in a victory for large-scale solar farms, the decision was successfully appealed and the council’s conduct was found to have been unreasonable. As a result, the municipality must pay the developer’s professional costs and the project can proceed.

The £450m solar farm was acquired by Quinbrook Infrastructure Partners from Hive Energy and Wirsol in 2021.

Gareth Phillips, partner and head of client relations, global energy sector, at law firm Pinsent Masons, led the call, stating that the outcome is “confirmation that the developer’s battery proposals met planning and safety requirements, and the local authority’s rejection of the plan was made without justification.”

“The award of full costs is reassuring that unreasonable conduct by public decision makers, which serves to delay clean energy projects, will be brought to justice,” Phillips added.

See also  Indian Loom Solar unveils 261 kWh BESS for C&I applications – SPE

“The project will be an important step in supplying Britain with clean, renewable solar energy and an essential part of the country’s ambitions to meet its net zero targets.

“This is a case where the developer, statutory advisers and local authority planning officers did everything required of them, with officers taking the extra step of consulting the local community and appointing an independent expert to provide greater certainty to get. . Both were let down by unfounded and politically motivated decision-making.”

Source link

appealed BESS Cleve Councils Hill refusal successfully Swale
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

UK government considers community grant for battery storage

June 5, 2026

UK CfD scheme provides optimism for the UK investment landscape

June 5, 2026

Fidra Energy buys 1GW BESS from Innova

June 4, 2026
Leave A Reply Cancel Reply

Don't Miss
Residential

Financiers—not homeowners—qualify for domestic content on residential solar

By solarenergyNovember 12, 20240

Contrary to initial interpretations, it is possible for residential solar projects to take advantage of…

PV powered lighting solution for rural areas – SPE

October 15, 2024

Mitsubishi Debuts 640 KW heat pump with hot water up to 90 C – PV Magazine International

October 6, 2025

Field committees 50 MW/100MWH Bess in Scotland

August 22, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026

‘Come out from behind your screen, our industry is ultimately about people’

June 6, 2026
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.