Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Distributed solar capacity in Argentina grew by 34.5% in the first half of the year

July 23, 2026

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

Cornwall Insight cuts price ceiling forecast after Burnham’s VAT cut

July 22, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Thursday, July 23
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Energy Storage - Developers ‘not confident’ about access in a new connection plan
Energy Storage

Developers ‘not confident’ about access in a new connection plan

solarenergyBy solarenergyFebruary 20, 2025No Comments4 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email
Panel members on Solar Media’s Energy Storage Summit EU, organized in London, discussed the reforms of Neso’s network connection. Image: Solar Media.

On a panel on the Energy Storage Summit in London, Alasdair Macmillan, said head of connection policy at OFGEM that reforms of the network connection will ultimately mean “a clearer signal for networking about what to build”.

On Friday (February 14), orgem released his judgment on the proposed reforms of the National Energy System Operator (Neso) and will announce its final decision in March. Macmillan further stated that the reforms “will offer more investor confidence that your project will connect”.

Developers of energy storage do not seem so certain. Bex Sherwood, head of development on Field, said that, although “not because of a lack of trying”, nobody has faith in their chances of getting into gate 2 under the new process.

“We have lived and breathing reform,” Sherwood continued, “and perhaps still tools have to fall on a project to which we have spent £ 1 million because we are unlikely to get a gate 2 offer”.

For Sherwood, the speed with which Neso reforms have been developed means errors in methodology. “We have seen that decisions at a high level have been imposed on random zone maps that are not based on system needs. The use of the planning status and opposites for grid means no readyness – and if this is the case, it does not take the available or viability into account. “

Another problem with the final proposal from Neso was the reduction of the projects for criminal costs that do not deliver important milestones as soon as paying in the queue. Sherwood said that the process “was wrongly stimulated”.

See also  Solar Landscape will plan community solar projects for NSA-owned storage properties

This is something Natpower UK Managing Director John Sturman also had problems with.

Sturman took a more diplomatic image and pointed out that everyone agrees that it is necessary to get ‘speculators’ in the queue. The problem is for him that Neso became involved in the Zonal Plan, a movement that Sturman saw as a market interference – “let the market decide where the projects should go”.

Long -term assets that enter the queue

Sturman also noted that the proposals from Neso have “no reimbursement” for larger assets with a longer duration, which leads to a “network of battery storage activa built at just 2 hours duration”, not enough to support the network or reduce consumer accounts.

Oonagh O’grady, vice-president of International Origination for Long-Duration Energy Storage (LDES) Firm Hydrostor pointed out that the absence of LDEs in the proposals brings great uncertainty on the market. The need for clarity about timings that the new queue process is intended to offer is “critical” for LDES investments, given the long lead time on technology.

However, O’grady noted that in the Clean Power 2030 plan of the government (CP30), LDES and shorter storage are separated. This is partly due to the lack of LDEs that will probably come online before 2030, but it is a movement that O’grady said is welcome.

However, there is a need for more clarity about how the reform of the grid connection in the queue fits other initiatives such as CP30, the contracts for Difference (CFD) control and the new investment mechanism for CAP-and-Floor for LDES.

See also  Root-Power awarded permission for 40 MW/80mWh Rotherham Bess

CEO of Masdar Arlington, Matt Clare, said that the new queue system leaves a “policy gap” between projects at distribution level that are more than 100 MW, which means they fall through the cracks; Orgem must “step in and sort something out”, which shows that not every possibility has been treated.

This, for Clare, is not a bad thing, just the result of the speed with which Neso and OREM have to move. Allowing that it is not a popular opinion, Clare said that the two companies have done “a lot of good work”.

“It’s not perfect and I understand the frustrations of developers, but they are also partly the culprit.”

Orgem’s Macmillan repeated that all proposed reforms have undergone a “fast but robust” policy process, and added that there were no problems that were discussed during the panel, the Ofmem was not yet aware of.

“In an ideal world, more time would have been fun, but there is a real need for speed that I appreciate will not be comfortable. The queue has grown astronomically and we must be low in low as quickly as possible.

“It was always the case that large -scale raster reform would create winners and losers; Neso had to pull the line somewhere. ‘

Source link

access confident connection developers plan
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

SmartestEnergy, Greentech ink CfD PPA for the Kent solar project

July 22, 2026

The British Army commissions a 1.7 GWh PV project at Larkhill Garrison

July 21, 2026

British hotel invests £300,000 in solar and storage amid price pressure

July 20, 2026
Leave A Reply Cancel Reply

Don't Miss
News

Decommissioned solar panels that are still deemed functional are being reinstalled at the Texas factory

By solarenergyJuly 26, 20240

SolarCycle’s recycling facility in Texas with its second-hand solar power plant. Credit: Solar cycle Solar…

German startup offers self-adhesive film for glare-free PV modules – SPE

July 22, 2024

CSI scales Bess to 8.36 MWh in five independent cupboards

September 4, 2025

Two large -scale British solar farms submitted for planning

September 29, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Distributed solar capacity in Argentina grew by 34.5% in the first half of the year

July 23, 2026

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

Cornwall Insight cuts price ceiling forecast after Burnham’s VAT cut

July 22, 2026

SmartestEnergy, Greentech ink CfD PPA for the Kent solar project

July 22, 2026
Our Picks

Distributed solar capacity in Argentina grew by 34.5% in the first half of the year

July 23, 2026

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

Cornwall Insight cuts price ceiling forecast after Burnham’s VAT cut

July 22, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.