Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Sunday, June 7
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - News - DSD Developer Network Partner completes 675-KW solar system for Illinois REC Center
News

DSD Developer Network Partner completes 675-KW solar system for Illinois REC Center

solarenergyBy solarenergyJuly 9, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

DSD Renewables (DSD) And General Energy Corp. have completed a 674.96-KW solar installation on the roof for Elmhurst Park District in Illinois.

General Energy Corp.

The system, located on the courts plus recreational facility, compensates 50% of the energy needs of the district with clean electricity. During the 20-year agreement, the district expects to save around $ 307,000.

“This milestone reflects our dedication to reduce our environmental footprint while serving our community,” said Angela M. Ferrentino, director of Referendum Projectbouw for Elmhurst Park District. “This solar project represents an investment in our parks, people and planet, and was more than just an infrastructure upgrade. We are convinced that it will have a positive impact on the Elmhurst community for a long time.”

General Energy started the construction of the project in September 2024 and reached mechanical completion at the beginning of July 2025. The ELMHURST project is financed through a 20-year-old PPA, so that the district can avoid the prior costs of construction and development, while they can save every month on its energy bill.

“This project is a good example of how investing in solar energy can really improve public spaces and sustainability and can be woven into the daily life of the community,” says Tony Jaswal, vice -president of General Energy. “DSD served as a trusted partner and together we are proud to deliver such an impactful project to the public.”

General Energy is part of DSD’s Developer Network, a Channel Partner program that offers regional developers the tools and resources they need to successfully develop more projects. DSD will possess and exploit the project in the long term.

See also  Uniper will build a 68.8 MW solar project in Scotland

“Elmhurst Park District gives a strong example for how public organizations can lead the way in the acceptance of clean energy,” said Katherine Lillydahl, senior account executive for DSD’s Developer Network. “Projects such as these strengthen our dedication to help communities to build a more sustainable energy future and accelerate acceptance throughout the country.”

News item from DSD

Source link

675KW Center completes developer DSD Illinois network partner REC solar system
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

Letter from China’s PV Industry: Arctech wins 2.1 GW solar deal

June 5, 2026

ComEd starts a new energy pilot with a solar rebate on the roof of a brewery

June 5, 2026
Leave A Reply Cancel Reply

Don't Miss
News

OFEMGEM GREEN LIGHTS All transmission -Upgrades for clean electricity 2030

By solarenergyJuly 1, 20250

Neil Kenward, director for strategy, economy, research and net zero on OFGem, spoke today on…

Machine learning-based fault detection technique for bifacial PV – SPE

October 23, 2025

UK government unveils Clean Energy Jobs Plan

October 20, 2025

Tigo Energy brings off-grid solar package from-PV Magazine International

April 26, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026

‘Come out from behind your screen, our industry is ultimately about people’

June 6, 2026
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.