Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Mingyang presents semi-transparent PV panels

May 9, 2025

Powin introduces 6.26 MWH Pod Max Containerized Battery – PV Magazine International

May 9, 2025

Dunext introduces Outdoor Energy Storage Cabinet – PV Magazine International

May 9, 2025
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Friday, May 9
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Energy Storage - Engie breaks ground for 800 MWh battery in Belgium – SPE
Energy Storage

Engie breaks ground for 800 MWh battery in Belgium – SPE

solarenergyBy solarenergyJuly 11, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Once completed, the four-hour battery energy storage project will operate under a 15-year contract with Elia, the Belgian electricity grid operator, and be located next to Engie’s gas-fired power station in Vilvoorde.

July 10, 2024 Marija Maisch

From pv magazine ESS news place

French electricity company Engie has started construction of one of Europe’s largest battery energy storage systems (BESS) at the gas power plant site in Vilvoorde, north of Brussels.

Once completed, the 200 MW/800 MWh Vilvoode BESS project will cover a site of 3.5 hectares and contain 320 battery modules measuring 25 m x 4 m x 3 m. The battery park has a 15-year contract with Elia, the national grid operator.

“[The site] has sufficient space and excellent connectivity to the electricity grid,” says Quentin Renoy, BESS Business Developer at Engie Belgium.

This milestone follows the project’s construction permit in July 2023 and its selection for capacity compensation in October 2023. After last year’s auction The Belgian authorities said this that Engie’s 796 MW gas power plant in Vilvoorde would initially serve as a backup power plant for three years and could then be extended given “the current limitations of green energy capacity.”

Engie described this as “a double success within the CRM framework”, which ensures the future of its site in Belgium.

The BESS project in Vilvoorde will start in two phases, with the commissioning of 100 MW of batteries in September 2025, and a further 100 MW in January 2026.

To read further, visit our ESS news website.

This content is copyrighted and may not be reused. If you would like to collaborate with us and reuse some of our content, please contact: editors@pv-magazine.com.

See also  Wooden solar carports for residential and commercial applications – SPE

Popular content

Source link

battery Belgium breaks Engie Ground MWh SPE
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Powin introduces 6.26 MWH Pod Max Containerized Battery – PV Magazine International

May 9, 2025

Australian state prep

May 9, 2025

BYD launches a new residential battery – PV Magazine International

May 9, 2025
Leave A Reply Cancel Reply

Don't Miss
Solar Industry

Letter from China’s PV Industry: Tongwei Wins $5.4 Billion Polysilicon Order from Longi

By solarenergyMay 14, 20240

Tongwei has agreed to supply more than 862,400 tons of polysilicon to Longi from 2024…

Encore Renewable Energy completes 2 community solar projects in Maine

January 22, 2025

Bureau of Land Management issues final rules for renewable energy projects on public lands

April 30, 2024

Chinese scientists build 20.3%-efficient mini inverted perovskiet solar modules via Slot Die Coating-PV Magazine International

March 5, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Mingyang presents semi-transparent PV panels

May 9, 2025

Powin introduces 6.26 MWH Pod Max Containerized Battery – PV Magazine International

May 9, 2025

Dunext introduces Outdoor Energy Storage Cabinet – PV Magazine International

May 9, 2025

As storage scales, CO-located solar projects must adapt-PV Magazine International

May 9, 2025
Our Picks

Mingyang presents semi-transparent PV panels

May 9, 2025

Powin introduces 6.26 MWH Pod Max Containerized Battery – PV Magazine International

May 9, 2025

Dunext introduces Outdoor Energy Storage Cabinet – PV Magazine International

May 9, 2025
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2025 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.