Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Zendure launches battery ranges for residential PV – SPE

April 23, 2026

The CFO’s Guide To Nature Based Solutions

April 23, 2026

Inside PV Manufacturing: Belga Solar’s module factory in Belgium

April 23, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Thursday, April 23
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Finance - EU opens third cross-border tender for solar energy – SPE
Finance

EU opens third cross-border tender for solar energy – SPE

solarenergyBy solarenergyMarch 4, 2026No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

The EU’s third cross-border solar tender offers a share of €54.9 million ($63.8 million) in solar-plus-storage projects in selected Bulgarian districts and ground-mounted solar projects in Finland, with financing from Luxembourg. The deadline for registration is September 1.

March 4, 2026
Patrick Jowett

The European Commission has opened a new call for proposals for ground-mounted solar energy projects to be developed through cooperation between contributing and recipient EU Member States.

It is the third cross-border solar tender announced under the EU Renewable Energy Financing Mechanism (RENEWFM). Projects in Bulgaria and Finland are eligible, with a total amount of €54.9 million ($63.8 million) in investment support. Luxembourg, as a contributing Member State, provides the financing.

Eligibility Criteria states that the funding round will support ground-mounted solar projects co-located with battery energy storage systems (BESS) in Bulgaria, which are located in the districts of Pernik, Kyustendik or Stara Zagora, as well as ground-mounted solar projects in Finland, somewhere other than the Åland region.

Support in Finland is limited to 400 MW. No upper capacity limit has been set in Bulgaria, although a project’s solar and storage units must have the same grid access point.

Each project must be a minimum of 10 MW and a maximum of 100 MW. The selected facilities have until March 1, 2029 to begin commercial operations.

The European Executive Agency for Climate, Infrastructure and Environment (CINEA), which is managing the tender, is organizing a virtual information day on April 17 to present ranking criteria and rules for grant payments.

Potential bidders have until September 1, 2026 to submit applications. Grant agreements are scheduled for singing in June 2027.

See also  New interactive map of the prices of renewable energy in Europe - PV Magazine International

The EU’s first cross-border solar tender has been launched April 2023with Luxembourg financing the projects and Finland hosting. The funding call closed in May 2024 when CINEA signed grant agreements with seven solar projects in Finland with a combined capacity of 212.99 MW.

A second tender was launched in July 2024which covers solar energy in Finland and onshore wind energy in Estonia, with Luxembourg again providing the financing. In May last year, grant agreements were signed for seven solar energy projects and two wind projects, with a total capacity of 445.65 MW.

Bulgaria installed 1.4 GW of solar energy last year, bringing its total capacity to just under 6 GW. Finland added 227 MW of utility-scale solar power last year, a calendar year record for the country.

This content is copyrighted and may not be reused. If you would like to collaborate with us and reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Source link

crossborder Energy opens solar SPE tender
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Zendure launches battery ranges for residential PV – SPE

April 23, 2026

Solar energy’s rebound effect could increase European electricity demand by 5% by 2050 – SPE

April 23, 2026

Repowering key for Japanese solar assets nears end of feed-in tariff – SPE

April 23, 2026
Leave A Reply Cancel Reply

Don't Miss
Energy Storage

Engie, Metlen ink 235MW solar PPA

By solarenergyOctober 22, 20250

Metals and energy production company Metlen has signed a power purchase agreement (PPA) with French…

Switzerland publishes database on alpine PV systems – SPE

July 29, 2024

CATL unveils 6.25 MWh energy storage system TENER

April 30, 2024

Enough backup energy to power any load in the home

November 13, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Zendure launches battery ranges for residential PV – SPE

April 23, 2026

The CFO’s Guide To Nature Based Solutions

April 23, 2026

Inside PV Manufacturing: Belga Solar’s module factory in Belgium

April 23, 2026

Solar energy’s rebound effect could increase European electricity demand by 5% by 2050 – SPE

April 23, 2026
Our Picks

Zendure launches battery ranges for residential PV – SPE

April 23, 2026

The CFO’s Guide To Nature Based Solutions

April 23, 2026

Inside PV Manufacturing: Belga Solar’s module factory in Belgium

April 23, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.