Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Sunday, June 7
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Finance - EU opens third cross-border tender for solar energy – SPE
Finance

EU opens third cross-border tender for solar energy – SPE

solarenergyBy solarenergyMarch 4, 2026No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

The EU’s third cross-border solar tender offers a share of €54.9 million ($63.8 million) in solar-plus-storage projects in selected Bulgarian districts and ground-mounted solar projects in Finland, with financing from Luxembourg. The deadline for registration is September 1.

March 4, 2026
Patrick Jowett

The European Commission has opened a new call for proposals for ground-mounted solar energy projects to be developed through cooperation between contributing and recipient EU Member States.

It is the third cross-border solar tender announced under the EU Renewable Energy Financing Mechanism (RENEWFM). Projects in Bulgaria and Finland are eligible, with a total amount of €54.9 million ($63.8 million) in investment support. Luxembourg, as a contributing Member State, provides the financing.

Eligibility Criteria states that the funding round will support ground-mounted solar projects co-located with battery energy storage systems (BESS) in Bulgaria, which are located in the districts of Pernik, Kyustendik or Stara Zagora, as well as ground-mounted solar projects in Finland, somewhere other than the Åland region.

Support in Finland is limited to 400 MW. No upper capacity limit has been set in Bulgaria, although a project’s solar and storage units must have the same grid access point.

Each project must be a minimum of 10 MW and a maximum of 100 MW. The selected facilities have until March 1, 2029 to begin commercial operations.

The European Executive Agency for Climate, Infrastructure and Environment (CINEA), which is managing the tender, is organizing a virtual information day on April 17 to present ranking criteria and rules for grant payments.

Potential bidders have until September 1, 2026 to submit applications. Grant agreements are scheduled for singing in June 2027.

See also  Key insights from the Italian trade fair Key Energy – SPE

The EU’s first cross-border solar tender has been launched April 2023with Luxembourg financing the projects and Finland hosting. The funding call closed in May 2024 when CINEA signed grant agreements with seven solar projects in Finland with a combined capacity of 212.99 MW.

A second tender was launched in July 2024which covers solar energy in Finland and onshore wind energy in Estonia, with Luxembourg again providing the financing. In May last year, grant agreements were signed for seven solar energy projects and two wind projects, with a total capacity of 445.65 MW.

Bulgaria installed 1.4 GW of solar energy last year, bringing its total capacity to just under 6 GW. Finland added 227 MW of utility-scale solar power last year, a calendar year record for the country.

This content is copyrighted and may not be reused. If you would like to collaborate with us and reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Source link

crossborder Energy opens solar SPE tender
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

Britain’s next energy dependency is already taking shape

June 5, 2026

Letter from China’s PV Industry: Arctech wins 2.1 GW solar deal

June 5, 2026
Leave A Reply Cancel Reply

Don't Miss
Energy Storage

The use of Tesla batteries increases in the second quarter – SPE

By solarenergyJuly 4, 20240

Tesla says it has registered a significant increase in energy storage deployment, officially reporting sales…

Sigenergy unveils 2.68 kWh battery for balcony PV – SPE

March 5, 2026

New Jersey expands state community solar program by 3 GW

March 6, 2026

The largest solar project in Latin America is online PV Magazine International is PV Magazine International

April 10, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026

‘Come out from behind your screen, our industry is ultimately about people’

June 6, 2026
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.