Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

Cornwall Insight cuts price ceiling forecast after Burnham’s VAT cut

July 22, 2026

SmartestEnergy, Greentech ink CfD PPA for the Kent solar project

July 22, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Thursday, July 23
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Technology - Iberdola-led project develops solid-state battery module for stationary storage – SPE
Technology

Iberdola-led project develops solid-state battery module for stationary storage – SPE

solarenergyBy solarenergyJanuary 15, 2026No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Basquevolt and Bcare have successfully developed and integrated the first solid-state cells into a module for stationary applications, within the Iberdrola-led ASTRA-CC project (2023-2025).

January 15, 2026
Pilar Sanchez Molina

By pv magazine Spain And ESS news

Basquevolt, the Basque solid-state battery initiative whose shareholders are the Basque government, Iberdrola, CIE Automotive, Enagás, EIT InnoEnergy, CDTI (via Innvierte) and CIC energiGUNE, announced this week a “game-changing milestone in storage” in collaboration with Bcare, a Basque technology and research center specialized in batteries and storage systems. In a statement, the companies said that for the first time they have developed and integrated solid-state battery cells into a module intended for stationary applications.

This achievement was carried out within the framework of the ASTRA-CC R&D project, led by Iberdrola and integrated into the HAZITEK call of the Basque Government, which promotes strategic technologies for the energy transition.

Within ASTRA-CC, Basquevolt and Bcare were responsible for the design, development and validation of a solid-state cell specifically optimized for stationary use, and for its integration into a functional module. Their work demonstrated the technical feasibility of the technology not only at the cell level, but also in modular configurations – an important step for future scalability and integration into electrical infrastructures. The module has been tested within a public direct current (DC) network architecture.

The ASTRA-CC project (2023–2025) is a strategic industrial research initiative focused on the development of technologies and components for DC networks, with the aim of accelerating the integration of renewable energy and storage systems. It is led by i-DE Redes Eléctricas Inteligentes (i-DE Smart Grids) and includes entities of the Basque Science, Technology and Innovation Network, with funding from the Basque Government and the European Union through the ERDF 2021-2027.

See also  Field tests show that perovskite solar panels can retain 78% of their initial efficiency after one year – SPE

In July, Basquevolt announced it would focus its activities on the development and supply of electrolytes, which act as conductors in batteries. The company’s Board of Directors expects the industrialization and commercialization of its electrolyte to begin in 2027.

This content is copyrighted and may not be reused. If you would like to collaborate with us and reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Source link

battery develops Iberdolaled module project solidstate SPE stationary storage
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

SmartestEnergy, Greentech ink CfD PPA for the Kent solar project

July 22, 2026

Nominations open for Solar Builder’s Project of the Year Awards 2026

July 21, 2026

The British Army commissions a 1.7 GWh PV project at Larkhill Garrison

July 21, 2026
Leave A Reply Cancel Reply

Don't Miss
Finance

Alcazar Energy Partners secures $490 million for second sustainable energy fund – SPE

By solarenergyMay 25, 20240

Alcazar Energy Partners has reached financial close of a total of $490 million for its…

SolarAPP+ streamlines the solar permitting process

May 20, 2024

Dongguk University researchers develop scalable zinc-ion battery technology for industrial use

May 14, 2025

New community solar developer Stellera is launched

May 1, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

Cornwall Insight cuts price ceiling forecast after Burnham’s VAT cut

July 22, 2026

SmartestEnergy, Greentech ink CfD PPA for the Kent solar project

July 22, 2026

Flexibility as an asset

July 22, 2026
Our Picks

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

Cornwall Insight cuts price ceiling forecast after Burnham’s VAT cut

July 22, 2026

SmartestEnergy, Greentech ink CfD PPA for the Kent solar project

July 22, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.