Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

Cornwall Insight cuts price ceiling forecast after Burnham’s VAT cut

July 22, 2026

SmartestEnergy, Greentech ink CfD PPA for the Kent solar project

July 22, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Thursday, July 23
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Solar Industry - India approves solar cellers with 13 GW of annual production capacity
Solar Industry

India approves solar cellers with 13 GW of annual production capacity

solarenergyBy solarenergyAugust 6, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

India has approved six manufacturers for its approved list of models and manufacturers (ALMM) for solar cells, a total of 13 GW of annual production capacity. The list includes FS India (First Solar’s India Unit), Jupiter, Emmvee, Mundra (Adani), Premier Energies and Renew.

August 6, 2025
Uma Gupta

By PV Magazine India

India’s Ministry of New and Renewable Energy (MNRE) has released the Almm for PV cells. The list contains six domestic manufacturers: FS India (First Solar’s India Arm), Jupiter, Emmvee, Mundra (Adani), Premier Energies and Renew. They have a combined annual production capacity of solar cells of 13 GW.

Mundra (Adani) has an approved cumulative capacity of 3.832 MW, including 1,939 MW bifacial monocrystalline silicon passivated emitter and rear contact (perc) and 1.893 MW Bififacial N-Tunneloxide oxide contact).

FS India has 3,212 MW, Premier Energies has 1,925 MW Bifacial Monocrystalline Silicon Perc, Emmvee has 1.553 MW from Bifacial N-Type Monocrytalline Silicon Percy Perc and Jupiter International has 779 MW PERC. Bifacial.

All projects that fall under ALMM with bidding data on or before 31 August 2025 must use Almm-Gente Solar Panels, but are exempt from the use of ALMM-Gente Cells, even if they are used after 1 June 2026.

Projects with bidding dates of bids after 31 August 2025, may only use ALMM-Genter modules and cells, regardless of the commissioning date, including those for 1 June 2026.

This content is protected by copyright and may not be reused. If you want to work with us and reuse part of our content, please contact: editors@pv-magazine.com.

See also  IEA-PVPS calls for harmonized testing and certification for building-integrated solar photovoltaics – SPE

Popular content

Source link

Annual approves capacity cellers India production solar
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

SmartestEnergy, Greentech ink CfD PPA for the Kent solar project

July 22, 2026

Pennsylvania passes law establishing solar decommissioning plans

July 21, 2026
Leave A Reply Cancel Reply

Don't Miss
Solar Industry

Innovatieve leasemiddelen voor zonnepanelen op daken YMCA | Projecten wekelijks

By solarenergyNovember 18, 20250

Door Brad Kramer 17 november 2025 In de editie van vandaag van Projecten wekelijkskijken we…

Jackery, Geneverse present new energy storage system for homes – SPE

September 12, 2024

Federal oversight jeopardizes renewable energy investments

June 30, 2026

The world’s first 628 Ah grid-scale battery goes into service – SPE

February 12, 2026
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

Cornwall Insight cuts price ceiling forecast after Burnham’s VAT cut

July 22, 2026

SmartestEnergy, Greentech ink CfD PPA for the Kent solar project

July 22, 2026

Flexibility as an asset

July 22, 2026
Our Picks

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

Cornwall Insight cuts price ceiling forecast after Burnham’s VAT cut

July 22, 2026

SmartestEnergy, Greentech ink CfD PPA for the Kent solar project

July 22, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.