Image: Anton Lecock, Unsplash
JordanThe Ministers’ Cabinet has approved a project that will install solar systems with the houses of people with disabilities.
According to the Jordan News Agency, the five -year project will run between 2026 and 2030 and JOD will cost 1.5 million ($ 2.1 million).
It is planning to install with Grid-connected solar systems for 1,000 houses of the disabled or families, based on submitted applications.
A technical committee consisting of representatives from the Ministries of Energy, Social Development and the Higher Council for the Rights of Persons with Disabilities will supervise the implementing criteria.
The Jordan government is described as “progressive“On clean energy, with a certain focus on stimulating small-scale solar and heat pump installations.
In September 2024, that of the country discount schedule For residential solar energy restart, with a maximum of 30% of the costs for buying and installing a solar system. The schedule is reverse by some of the leading banks of the country.
At the end of 2024, the cumulative solar capacity of Jordan was 2,077 MW, an increase of 1,990 MW at the end of the year before, according to figures from the International Renewable Energy Agency (Irena). In May, the Jordanian government opened one 200 MW Solar tendency.
This content is protected by copyright and may not be reused. If you want to work with us and reuse part of our content, please contact: editors@pv-magazine.com.
Popular content

