Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

HoarFrost-inspired technology to improve MPPT in PV systems under partial Shadow-PV Magazine International

June 6, 2025

InensEnergy completes 250 MW Ohio Solar Project for Microsoft

June 6, 2025

Future housing stands on the roof Zonne -Zon will be mandatory

June 6, 2025
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Friday, June 6
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - News - Longi heterojunction back contact solar cell achieves 27.81% efficiency
News

Longi heterojunction back contact solar cell achieves 27.81% efficiency

solarenergyBy solarenergyApril 15, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Longi announced that it has achieved a upgraded Hi-MO 9-sun panel with return contact “HPBC 2.0” technology 24.8% efficiency with a maximum capacity of 670 W.

By integrating zero bus with half a cell architecture, Longi was able to stimulate the power of the modules by 10 W. The Back contact Hi-MO 9 provides 1.5% more better efficiency than top-con brands.

In addition, Longi has announced that it has achieved 27.81% efficiency for its self-developed heterojunction intercourse connected back contact (HIBC) solar cells, as certified by the German ISFH (Institute for Solar Energy Research Hamelin).

To further strengthen the market potential of highly efficient BC technology, Longi collaborated with Tüv Rheinland to launch the “Global Optimal Optimal BC Solar Power Plant Design Challenge”. Competition, open to consultancy firms, EPC companies and investors of renewable energy worldwide, invites innovative designs for the land-mounted power plant projects of more than 50 MW in various application scenarios. Submissions are accepted From 11 April to 30 November 2025, Tüv Rheinland will lead an expert panel to rigorously evaluate submissions on the basis of BC technology -Tegration, PVSYST -Simulation results and design innovation. The total price pass is around $ 280,000.

Dennis She, vice-president of Longi, emphasized: “BC technology represents the ultimate progress in crystalline silicon solar cells. With an adult worldwide ecosystem, highly efficient BC modules are quickly implemented over various applications. Partners to build a sustainable future.”

News item from Longi

Source link

See also  Panels on the roof, EV chargers and smart thermostats can shoot in to stimulate the resilience of the electricity grid
achieves cell contact efficiency heterojunction Longi solar
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

InensEnergy completes 250 MW Ohio Solar Project for Microsoft

June 6, 2025

New pollution room for testing dust structure in solar modules – PV Magazine International

June 6, 2025

Until UK Solar Acquisition sites unveiled

June 6, 2025
Leave A Reply Cancel Reply

Don't Miss
Solar Industry

Horizon Power unveils a solar hydrogen microgrid in Western Australia

By solarenergyJuly 9, 20240

Horizon Power has developed a solar hydrogen microgrid in Western Australia, including a customized control…

Hyundai Motor Plans Fuel Cell Factory in South Korea – PV Magazine International

March 12, 2025

ABB will acquire Gamesa Electric’s activities, including BESS, utility inverters

December 22, 2024

HUEG unveils new mounting system with patented clamp design

December 4, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

HoarFrost-inspired technology to improve MPPT in PV systems under partial Shadow-PV Magazine International

June 6, 2025

InensEnergy completes 250 MW Ohio Solar Project for Microsoft

June 6, 2025

Future housing stands on the roof Zonne -Zon will be mandatory

June 6, 2025

Aerocompact introduces tool-free PV mounting system

June 6, 2025
Our Picks

HoarFrost-inspired technology to improve MPPT in PV systems under partial Shadow-PV Magazine International

June 6, 2025

InensEnergy completes 250 MW Ohio Solar Project for Microsoft

June 6, 2025

Future housing stands on the roof Zonne -Zon will be mandatory

June 6, 2025
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2025 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.