Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Sunday, June 7
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Technology - Novar is installing its own grid connection for a solar park in the Netherlands – SPE
Technology

Novar is installing its own grid connection for a solar park in the Netherlands – SPE

solarenergyBy solarenergyOctober 16, 2025No Comments4 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

The Avermieden grid connection, which allows Novar to act as its own distribution grid operator, will soon connect the first phase of a solar project that should become the largest solar park in the Netherlands.

October 15, 2025
Patrick Jowett

The Dutch green energy company Novar has created its own grid connection for a solar park in the Netherlands.

The Avermieden grid connection, located in the province of Groningen in the Northern Netherlands, is a closed distribution system (CDS) that functions as a private network.

Sander Daniëls, head of Realization at Novar and project director of Avermeiden, explains pv magazine That work on the project was developed because the local distribution system operator (DSO), the Dutch state-owned company Enexis, did not have the capacity to connect projects that would supply power to the congested medium-voltage network.

Thanks to Avermieden’s CDS, Novar can instead act as its own DSO, by connecting directly to the high-voltage grid of transmission system operator TenneT.

The CDS consists of underground cables and a transformer station. It transports electricity from the connected assets via a 33 kV cable to the transformer station, where it is connected to an 8 km long 220 kV cable that runs from the transformer station to TenneT’s high-voltage substation.

“The power cable itself is designed for 650 MVA, so it can accommodate significantly more than 200 MVA of solar energy,” Daniëls explains, adding that there is capacity in the system to develop a maximum of three transformers in total.

The first phase of the Eekerpolder solar project, totaling 87 MW, will soon be connected to the GDS.

See also  Air-water heat pump for solar district heating – SPE

The solar park, a joint collaboration between Novar and Coöperatie Eekerpolder, is spread across the municipalities of Midden-Groningen and Oldambt, with the Avermieden transformer station in the middle. Once completedIt is expected to have a capacity of nearly 200 MW, making it the largest solar project in the country to date.

Its development will take place in three phases, Daniëls said, with each phase of the solar park receiving SDE++ support in a different year of the Dutch sustainable energy scheme. The solar park should be ready next year.

It is planned that battery energy systems will be connected to Avermieden in the future, while other private companies may also have the opportunity to connect to the private electricity grid. According to existing legislation in the Netherlands, no more than 500 users may be connected to the CDS network, including no households.

A statement from Novar explains that CDS Avermieden is designed to ensure that supply and demand are continuously balanced by supplying electricity directly to TenneT when demand is high and storing excess energy in batteries when demand is low.

Daniels said pv magazine that now that the energy transition in the Netherlands is already at an advanced stage, the grid connection also offers innovative solutions for new and persistent challenges.

“This is a great way to offer more advanced products that really fit in with the energy transition,” he says. “Both from an impact perspective and from a financial perspective, you can really try to optimize your assets to ensure that you are protected from all negative business case impacts, such as negative hours blocks.”

See also  The Spanish grid operator warns of sudden voltage fluctuations in the network - SPE

During the development of the Avermeiden project, Novar collaborated with the Dutch sustainable energy company Emmett Green, as well as with a wide network of specialized partners.

In September, the Dutch government proposed changes to its Environmental Decree to accelerate the licensing of electricity transmission and distribution projects above 21 kV, with the aim of expanding grid capacity and reducing congestion until 2032.

In addition, Dutch electricity transmission system operator Tennet is investing €13 billion ($15.1 billion) to expand the national high-voltage grid. The plan includes the construction of 40 new high-voltage stations on land in every province.

In January 2019, Tennet and Enexis warned for the first time that there is very limited capacity for more solar energy in the provinces of Groningen, Drenthe and Overijssel.

This content is copyrighted and may not be reused. If you would like to collaborate with us and reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Source link

connection grid installing Netherlands Novar park solar SPE
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

Letter from China’s PV Industry: Arctech wins 2.1 GW solar deal

June 5, 2026

ComEd starts a new energy pilot with a solar rebate on the roof of a brewery

June 5, 2026
Leave A Reply Cancel Reply

Don't Miss
Technology

Genigie launches Gen 3 Hybrid inverters for combination with stackable storage – PV Magazine International

By solarenergyFebruary 19, 20250

The new inverters support up to 80 kWh three -phase battery storage. February 19, 2025…

Solar PPAs boost Spanish spot prices, but don’t suppress them – SPE

May 17, 2026

Renew Home launches virtual power plant solution – SPE

May 14, 2024

NextPower UK acquires a 29 MW battery energy storage system

November 29, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026

‘Come out from behind your screen, our industry is ultimately about people’

June 6, 2026
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.