Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Sunday, June 7
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Energy Storage - Plans progress for 1.8 GW pumped hydro storage project
Energy Storage

Plans progress for 1.8 GW pumped hydro storage project

solarenergyBy solarenergyJuly 23, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email
The project could be one of the largest PHES sites in Britain. Image: SSE Renewables.

SSE Renewables has unveiled plans to progress a 1.8 GW pumped hydro storage (PHES) project in Loch Fearna, Scotland, with a consortium led by Gilkes Energy.

The Fearna PHES project aims to develop tunnels and a new power station to connect SSE Renewables’ existing reservoir at Loch Quoich to a higher reservoir at Loch Fearna.

If the project proceeds, it could produce around 37 GWh of stored energy capacity, providing additional stability and flexibility to the UK electricity grid. It would export energy for 20 hours with a capacity of 1.8 GW. An offer for a grid connection totaling 1,795 GW has already been secured.

SSE confirmed that the project could become commercially operational in the mid-2030s, subject to a final investment decision.

Gilkes Energy said the Fearna PHES project will complement existing conventional hydropower projects in the area and “represents the next chapter in Scotland’s rich hydropower heritage”.

Under the terms of the joint venture, Gilkes Energy will lead the development of the project under a development services agreement with SSE Renewables, drawing on the company’s experience in developing PHES projects in Scotland.

Ross Turbet, head of hydropower investment management at SSE Renewables, stressed that PHES projects “will be critical to energy security and balancing the increasingly renewables-led energy system”.

“The proposed Fearna project is a welcome addition to our development pipeline of pumped storage hydro projects, which also includes our proposal to develop one of Britain’s largest pumped storage systems at Coire Glas in 40 years and our intention to expand our existing Sloy Power Station converted into a PHES facility” Turbet added.

See also  Olympian Michael Phelps installs Panasonic solar + storage system on home in Arizona

This article first appeared in our sister publication Current±.

Source link

hydro plans progress project pumped storage
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

UK government considers community grant for battery storage

June 5, 2026

UK CfD scheme provides optimism for the UK investment landscape

June 5, 2026

Nova commissions a 400kW floating solar project in Cheshire

June 4, 2026
Leave A Reply Cancel Reply

Don't Miss
Technology

East-west vertical PV as an antidote to pollution in desert climates – SPE

By solarenergyAugust 22, 20240

New research from Qatar shows that east-west oriented vertical PV installations can significantly help reduce…

Envision pushes energy storage density to new highs with 8 MWh, 20-foot container – SPE

September 9, 2024

Land use framework to protect agricultural land of high quality

February 3, 2025

New model to measure loss in floating PV by golf -induced loss

April 7, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026

‘Come out from behind your screen, our industry is ultimately about people’

June 6, 2026
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.